VACHALLENGER
Live / Allowed — Approved for publication (as of 30 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 10 Jan 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79422316
- Mark type
- Stylized text
- Filed
- 10 Jan 2025
- Attorney of record
- John Alumit
Goods and services
- Class 006 — Metal goods: Pipelines comprised of tubes, pipes, valves not being parts of machines, ducts and junctions made of metal, especially steel; penstock pipes of steel for the transport of crude oil or natural gas; pipe fittings made of metal, in particular of steel, in particular for oil pipelines or natural gas pipelines; gas-tight threaded pipe connectors made of metal, in particular steel, in particular for oil pipelines or natural gas pipelines; pipe sockets being metal pipe fittings made of metal, especially steel; threaded metal pipes, in particular steel; manifolds of metal for pipelines; metal pipe strings in the nature of metal pipes for the extraction of crude oil or natural gas; metal oil field pipes; metal drill strings comprised of metal drill pipes for use in oil and gas fields
- Class 037 — Building construction and repair services: Installation of threaded metal oil and gas pipes; installation of gas-tight threaded metal oil and gas pipe connectors; repair and maintenance of threaded oil and gas pipes; repair and maintenance of gas-tight metal threaded oil and gas pipe connectors
Owner
Prosecution history
- 30 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 26 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 26 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 26 Mar 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 26 Feb 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 26 Feb 2026 — FINAL REFUSAL E-MAILED
- 26 Feb 2026 — FINAL REFUSAL WRITTEN
- 28 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 27 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 27 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 05 Sept 2025 — REFUSAL PROCESSED BY IB
- 21 Aug 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 21 Aug 2025 — REFUSAL PROCESSED BY MPU
- 18 Jul 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 17 Jul 2025 — NON-FINAL ACTION WRITTEN