STEP S

Live / Allowed — Published for opposition (as of 17 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 13 Nov 2024 filing date already counts against anyone who files later.

Record

Serial number
79422285
Mark type
Design + words
Filed
13 Nov 2024
Published for opposition
17 Mar 2026
Attorney of record
Keith A. Weltsch

Goods and services

  • Class 009 — Scientific and electric apparatus: Scientific research and laboratory apparatus, educational apparatus and simulators for nuclear fusion and for use in nuclear reactors; scientific apparatus and instruments for nuclear fusion and for use in nuclear reactors; scientific, research, surveying, photographic, audiovisual, optical, weighing, measuring, signalling, detecting, testing, inspecting, and teaching apparatus and instruments for nuclear fusion and for use in nuclear reactors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; magnets; electromagnets; apparatus containing superconductive magnet assemblies; energy control devices for controlling energy usage for nuclear reactors; electric control devices for energy management; apparatus for monitoring electrical energy consumption; downloadable computer software for energy management and energy measurement; downloadable computer software for analysing and managing nuclear reactors and nuclear facilities; all of the aforesaid goods in relation to fusion energy
  • Class 011 — Environmental control apparatus: Nuclear reactors; nuclear generators; nuclear installations namely, nuclear power plants, nuclear generators and nuclear fusion reactors; nuclear power plant installations; nuclear generators, namely tokamaks in the nature of a machine using magnetic fields for generating nuclear energy; installations for processing nuclear fuel and nuclear moderating material in the nature of nuclear power plants, nuclear generators and nuclear fusion reactors
  • Class 037 — Building construction and repair services: Construction of nuclear reactors, nuclear facilities, and nuclear fusion plants; building construction services; construction of industrial buildings; heavy engineering construction, namely, construction of nuclear reactors, nuclear facilities, and nuclear fusion plants; construction of nuclear reactors; construction of nuclear power plants; servicing, namely maintenance and repair of nuclear plants; cleaning of nuclear plants; repair and maintenance of nuclear power plants; providing information relating to the repair or maintenance of nuclear power plants; building construction information; provision of construction advice; construction consultancy; construction project management services; construction planning
  • Class 040 — Treatment of materials: Generation of energy; energy production; production of energy by nuclear power plants; generation of electricity from nuclear fusion; electricity generation; processing of nuclear fuels; treatment of radioactive and other hazardous wastes; providing information in the field of nuclear energy production; provision of information, advice and consultancy in relation to the production of nuclear energy, and the treatment of radioactive and other hazardous waste
  • Class 042 — Scientific and technological services: Scientific research and analysis in the field of nuclear energy; scientific research in the field of nuclear energy power generation technology; scientific research and analysis in the field of nuclear fusion energy; scientific and technological services, namely scientific research and design in the field of plasma physics; engineering research; engineering research in the field of design, development and construction of nuclear power plants; engineering services for the design of structures; industrial design; engineering design; design of industrial plants; engineering and industrial design of nuclear power plants; nuclear engineering services; consultancy services relating to nuclear engineering; preparation of scientific reports relating to commissioning of nuclear units; construction project services, namely construction drafting, design and planning of nuclear power plants; design and development of nuclear power plants; design and development of tokamak fusion power devices for energy production; design and development of high temperature superconducting magnets; design and development of energy distribution networks; design and development of energy management and energy measurement software; design and development of computer software for analysing and managing nuclear reactors and nuclear facilities; scientific research consultancy in the field of nuclear energy; providing scientific information in the field of nuclear energy; all of the aforesaid services in relation to fusion energy

Owner

Prosecution history

  • 17 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 17 Mar 2026 — PUBLISHED FOR OPPOSITION
  • 11 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 10 Feb 2026 — WITHDRAWN FROM PUB - OG REVIEW QUERY
  • 26 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 12 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 12 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 12 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 11 Sept 2025 — NEW REPRESENTATIVE AT IB RECEIVED
  • 26 Jul 2025 — REFUSAL PROCESSED BY IB
  • 10 Jul 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 10 Jul 2025 — REFUSAL PROCESSED BY MPU
  • 15 May 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 14 May 2025 — NON-FINAL ACTION WRITTEN
  • 07 May 2025 — ASSIGNED TO EXAMINER

View this trademark record on Marksy