3DMF
Live / Applied — Final refusal mailed (as of 13 Jan 2026)
What this means for you
Not registered yet, but its 22 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79420826
- Mark type
- Stylized text
- Filed
- 22 Oct 2024
- Attorney of record
- Brian B. Darville
Goods and services
- Class 006 — Metal goods: Steel buildings; metal tanks [structures]; common metals and their alloys, including stainless steel; anti-friction common metals, unwrought or semi-wrought; extruded semi-wrought common metals; extruded unwrought common metals; white common metal, unwrought or semi-wrought; sheet metal; steel sheets; sheets of metal being sheet metal; forged metal parts; pressed metal parts; steel; stainless steel; steel, unwrought or semi-wrought; alloys of common metals; aluminum, namely, aluminum alloy, aluminum foil; steel alloys.
- Class 042 — Scientific and technological services: Scientific, technical and industrial research relating to metal materials and common metals; research and development of new products for others relating to metal materials and metals; technical advisory services related to engineering and engineering expertise (engineering work) in the field of metal materials and metals; testing the functionality of machines and material testing; material testing and analysis services; custom design of technological demonstrators being prototypes; engineering services relating to metal forming systems; conducting feasibility studies in the field of new technologies for use in metal forming, namely in high-energy hydroforming based on explosives for production of metal parts.
Owner
- SAFRAN NACELLES, FR
Prosecution history
- 13 Jan 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 13 Jan 2026 — FINAL REFUSAL E-MAILED
- 13 Jan 2026 — FINAL REFUSAL WRITTEN
- 17 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 17 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 05 Jul 2025 — REFUSAL PROCESSED BY IB
- 18 Jun 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 18 Jun 2025 — REFUSAL PROCESSED BY MPU
- 16 Apr 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 15 Apr 2025 — NON-FINAL ACTION WRITTEN
- 09 Apr 2025 — ASSIGNED TO EXAMINER
- 08 Apr 2025 — APPLICATION FILING RECEIPT MAILED
- 08 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 03 Apr 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB