RHODETEC
Live / Allowed — Published for opposition (as of 28 Jul 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 04 Mar 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79420347
- Mark type
- Stylized text
- Filed
- 04 Mar 2025
- Published for opposition
- 28 Jul 2026
- Attorney of record
- David L. Oppenhuizen
Goods and services
- Class 017 — Rubber goods: Reflective plastic films for use on windows; non-metallic reflective insulating sheeting for obviating heat transmission for use in manufactured housing, windows, doors, ducts; non-metallic reflective radiating sheeting for obviating heat transmission for use in manufactured housing, windows, doors, ducts; extruded plastics in the form of sheets, films, blocks, rods and tubes for use in manufacture
- Class 019 — Non-metallic building materials: Exterior blinds, not of metal and not of textile; plastic shutters; roller shutters, non-metallic; sun louvres of glass for buildings being glass panels for building construction purposes; jalousies, not of metal
Owner
- RHODETEC GmbH, DE
- RHODETEC GmbH, DE
Prosecution history
- 10 Sept 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 26 Aug 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 26 Aug 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 28 Jul 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 28 Jul 2026 — PUBLISHED FOR OPPOSITION
- 23 Jul 2026 — NOTIFICATION PROCESSED BY IB
- 22 Jul 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 08 Jul 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 08 Jul 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 25 Jun 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 26 May 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 26 May 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 26 May 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 07 Apr 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 07 Apr 2026 — FINAL REFUSAL E-MAILED