FLUIDPAL
Dead / Abandoned — Abandoned — failure to respond (as of 04 Mar 2026)
What this means for you
This application is over — abandoned 12 Feb 2026. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79419999
- Mark type
- Stylized text
- Filed
- 15 Jan 2025
- Abandoned
- 12 Feb 2026
Goods and services
- Class 007 — Machines and machine tools: Machines and installations for controlling cooling lubricant systems; installations, machines, control mechanisms and apparatus for maintenance, processing, separation or purification of glues, liquids, emulsions, oils, cooling lubricants; machines and machine tools for treatment of materials and for manufacturing; pumps as parts of machines, engines and motors; compressors as parts of machines; blowing machines; motors and engines, drive units and control mechanisms for operating machines, motors and engines; machines and installations for cleaning; filtering machines, separators and centrifuges; filters for machines, motors, and engines; ventilating pumps for cooling lubricants; mechanical cooling lubricant mixing apparatus; mechanical cooling lubricant maintenance apparatus; mechanical emulsion mixing apparatus; suction machines for industrial purposes, in particular skimmers; separators, in particular water separators, oil mist separators, oil separators and separators for cooling lubricants.
- Class 011 — Environmental control apparatus: Industrial filters; industrial treatment apparatus and installations; filters (parts of industrial installations).
Owner
Prosecution history
- 10 Sept 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 26 Aug 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 26 Aug 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 04 Mar 2026 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 04 Mar 2026 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 02 Mar 2026 — ASSIGNED TO EXAMINER
- 29 Aug 2025 — REFUSAL PROCESSED BY IB
- 12 Aug 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 11 Aug 2025 — REFUSAL PROCESSED BY MPU
- 26 Jun 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 25 Jun 2025 — NON-FINAL ACTION WRITTEN
- 24 Jun 2025 — ASSIGNED TO EXAMINER
- 05 Jun 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 28 Mar 2025 — APPLICATION FILING RECEIPT MAILED
- 28 Mar 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED