NEON
Live / Applied — Suspended — suspension letter mailed (as of 07 Jan 2026)
What this means for you
Not registered yet, but its 27 Sept 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79419065
- Mark type
- Stylized text
- Filed
- 27 Sept 2024
- Attorney of record
- Andrew D. Bochner
Goods and services
- Class 037 — Building construction and repair services: Construction of theme parks; construction, installation, maintenance, and repair of equipment necessary for cultural, sporting, educational and entertainment themed interactive and non-interactive exhibitions, attractions, and events in the nature of augmented reality (AR) computer hardware, virtual reality (VR) computer hardware, and other audiovisual, lighting, and mechanical hardware in the nature of animatronic and robotic entertainment figures, show action equipment, special effects machines, staging, truss and rigging systems, and show control hardware; consultancy services in the field of construction, installation, maintenance, and repair of materials and equipment for such cultural, sporting, educational and entertainment themed exhibitions, attractions, and events in the nature of exhibition sets and scenery, audiovisual display installations, sound systems and lighting control systems, animatronic and robotic entertainment figures, show control, special effects machines, staging, truss and rigging systems, and show control hardware; construction project management services in relation to the field of construction, installation, maintenance, and repair of materials and equipment for cultural, sporting, educational and entertainment themed exhibitions, attractions, and events in the nature of exhibition sets and scenery, audiovisual display installations, sound systems and lighting control systems, animatronic and robotic entertainment figures, show control, special effects machines, staging, truss and rigging systems, and show control hardware; construction of entertainment venues, exhibition facilities and themed attractions; none of the foregoing for use in connection with lighting consisting of gas tubes filled with neon gas
- Class 042 — Scientific and technological services: Design of interior décor; graphic arts designing; architectural services; architectural design services; architectural services in the nature of architectural project management services; engineering services in the nature of engineering project management services; architectural and architectural design services in relation to buildings, commercial premises and exhibition stands and facilities; technical project studies in the nature of conducting feasibility studies in the field of construction; technical architectural design services; computer design services in the nature of computer aided design services; retail design services in the nature of layout design services for interior space of retail business establishments; consultancy services relating to the aforesaid; none of the foregoing for use in connection with lighting consisting of gas tubes filled with neon gas
Owner
Prosecution history
- 07 Jan 2026 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 07 Jan 2026 — LETTER OF SUSPENSION E-MAILED
- 07 Jan 2026 — SUSPENSION LETTER WRITTEN
- 05 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 07 Jul 2025 — TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
- 07 Jul 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 07 Jul 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 07 Jul 2025 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 07 Jul 2025 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 28 Jun 2025 — REFUSAL PROCESSED BY IB
- 06 Jun 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 06 Jun 2025 — REFUSAL PROCESSED BY MPU
- 02 Apr 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW