ATW

Live / Applied — Non-final action mailed (as of 24 Oct 2025)

What this means for you

Not registered yet, but its 17 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79417993
Mark type
Word mark
Filed
17 Oct 2024

Goods and services

  • Class 007 — Machines and machine tools: Electrostatic generators; machines for the electronics industry; machines for manufacturing semiconductors; semiconductor wafer processing equipment; memory chip manufacturing machines; industrial robots; electric starter engines; battery core pressing machines; machinery for use in the manufacture of batteries; packaging machines; soldering apparatus, gas-operated; laser welding machines; wire welding machines; sorting machines for chemical processing; electric soldering apparatus
  • Class 009 — Scientific and electric apparatus: Electro-optical instruments for use in inspection and measurement of industrial components; electric installations for the remote control of industrial operations; batteries; photovoltaic solar modules for production of electricity; solar cells; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules
  • Class 035 — Advertising and business services: Bill-posting; dissemination of advertising matter; demonstration of goods; sample distribution; publicity services; radio advertising; on-line advertising on a computer network; outdoor advertising; distribution of products for advertising purposes; distribution and dissemination of advertising materials [leaflets, prospectuses, printed material, samples]; import-export agency services; sales promotion for others; marketing services, namely, development of advertising concepts in the nature of logos for others

Owner

Prosecution history

  • 15 Nov 2025 — REFUSAL PROCESSED BY IB
  • 24 Oct 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 24 Oct 2025 — REFUSAL PROCESSED BY MPU
  • 09 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 08 Sept 2025 — NON-FINAL ACTION WRITTEN
  • 06 Sept 2025 — ASSIGNED TO EXAMINER
  • 05 Sept 2025 — APPLICATION FILING RECEIPT MAILED
  • 05 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 21 Mar 2025 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
  • 27 Feb 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy