CDE PROPRESS

Live / Applied — Final refusal mailed (as of 13 Jan 2026)

What this means for you

Not registered yet, but its 18 Sept 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79417878
Mark type
Stylized text
Filed
18 Sept 2024
Attorney of record
Usha Menon

Goods and services

  • Class 007 — Machines and machine tools: Machines and machine installations for mining, sorting aggregates, sand and mineral materials, separating solids from liquids in slurry, washing sand and mineral aggregates, sand processing and production, ore processing, slurry and wastewater filtering, waste sorting and processing, and waste recycling for industrial use; chemical processing filter presses; filter presses for chemical processing; filtering machines for separating solids from slurry and wastewater in mining, quarrying and recycling operations; filters for industrial and mineral processing machines; filtering machines for chemical processing; centrifugal, plate, and membrane-type separators and centrifuges for industrial use; waste extraction machines being waste separator machines; liquid waste removal machines; oil-water separators being parts of industrial dewatering machines; water extracting machines; water pumps for water filtering units; water pumps for industrial slurry transfer and dewatering systems; parts, fittings and accessories for all the aforesaid goods sold as integral components of the goods.
  • Class 011 — Environmental control apparatus: Industrial wastewater treatment installations; industrial water treatment filters; water filtering apparatus and installations for industrial use in mining, sand washing and recycling plants; filters for industrial wastewater and slurry water; sewage treatment installations for industrial effluent; industrial water purification and recycling apparatus; waste water purification installations; industrial waste water purification and sludge dewatering plants; apparatus for waste water purification; water filtering and clarification units for industrial water recovery.
  • Class 037 — Building construction and repair services: Maintenance of industrial plants; construction of industrial plants; machinery installation services, namely, installation of sand washing, dewatering, and recycling machines in industrial plants; maintenance of dewatering plants; installation of dewatering plants, dewatering plant installation services; maintenance of recycling plants; installation of recycling plants, recycling plant installation services; installation and maintenance of filter presses and filtering equipment.
  • Class 042 — Scientific and technological services: Technology services and research services being technological research in the field of industrial engineering, filtration, and water treatment; technology services and research services relating to filter presses and filtering equipment used in mining, sand washing, and recycling industries; industrial analysis and research services being scientific and technological services in the field of process water recycling and dewatering systems; industrial analysis and research services relating to filter presses and filtering equipment; engineering; engineering design, consultancy and advisory services in the field of washing and dewatering plants, water treatment and recycling, air classification and ore processing; scientific and industrial analysis and research in the field of environmental and process engineering for engineering and construction projects; materials testing; engineering project management services; quality control for others in the field of industrial filtration and water treatment.

Owner

Prosecution history

  • 13 Jan 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 13 Jan 2026 — FINAL REFUSAL E-MAILED
  • 13 Jan 2026 — FINAL REFUSAL WRITTEN
  • 07 Nov 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 07 Nov 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 07 Nov 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 31 May 2025 — REFUSAL PROCESSED BY IB
  • 09 May 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 09 May 2025 — REFUSAL PROCESSED BY MPU
  • 21 Mar 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 20 Mar 2025 — NON-FINAL ACTION WRITTEN
  • 17 Mar 2025 — ASSIGNED TO EXAMINER
  • 28 Feb 2025 — APPLICATION FILING RECEIPT MAILED
  • 28 Feb 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 27 Feb 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy