FULL OF ENERGY
Live / Allowed — Published for opposition (as of 03 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 19 Dec 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 79417029
- Mark type
- Stylized text
- Filed
- 19 Dec 2024
- Published for opposition
- 03 Mar 2026
- Attorney of record
- Robert S. Broder
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity for electrical current flow in the energy production, energy managing and energy consumption fields; apparatus and instruments for the measurement and analysis of electricity, namely, electric devices for measuring electric current flow and electric devices for analyzing electric current flow; inverters; recorded and downloadable software for monitoring, regulating, optimizing and controlling energy production, energy needs and energy consumption for use in the energy production, energy managing and energy consumption fields; downloadable mobile applications for monitoring, regulating, optimizing and controlling energy production, energy storage, energy needs and energy consumption for use in the energy production, energy managing and energy consumption fields; electrical indicators for use in the energy sector for monitoring, regulating, optimizing and controlling electrical current flow; electronic data processing apparatus for use in the energy sector; downloadable databases in the field of optimal energy efficiency strategies for use in the energy production, energy managing and energy consumption fields
- Class 035 — Advertising and business services: Billing services for use in the energy industry; energy price comparison services; tracking and monitoring energy consumption for others for account auditing purposes; cost/yield analyses in the energy sector
- Class 037 — Building construction and repair services: Installation, maintenance and repair of installations for energy production, of electric control devices for energy management, of electric meters for measuring energy consumption, and of electric storage devices; assembly services relating to the installation of energy generating installations and energy management installations; cleaning of installations for energy production and energy managing
- Class 042 — Scientific and technological services: Development and programming of software, software applications and databases in the energy sector, all for others; installation, maintaining and maintenance of software and software applications in the energy sector; website hosting services in the energy sector; software as a service (SaaS) services featuring software for monitoring, regulating, optimizing and controlling energy production, energy storage, energy needs and energy consumption in the energy production, energy managing and energy consumption fields; rental of software and computer application software for monitoring, regulating, optimizing and controlling energy production, energy storage, energy needs and energy consumption in the energy production, energy managing and energy consumption fields; monitoring of energy systems by remote access to ensure proper functioning; technological consulting services in the fields of installations for energy production, energy managing and energy consumption measurement; consulting services in the fields of energy measurement to improve energy efficiency
Owner
Prosecution history
- 03 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 03 Mar 2026 — PUBLISHED FOR OPPOSITION
- 25 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 07 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 30 Jan 2026 — EXAMINER'S AMENDMENT ENTERED
- 30 Jan 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 30 Jan 2026 — EXAMINERS AMENDMENT E-MAILED
- 30 Jan 2026 — EXAMINERS AMENDMENT -WRITTEN
- 27 Jan 2026 — NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED
- 27 Jan 2026 — ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED
- 27 Jan 2026 — ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED
- 17 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 17 Dec 2025 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 26 Oct 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED