CLIMASYS

Live / Allowed — Published for opposition (as of 10 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 18 Dec 2024 filing date already counts against anyone who files later.

Record

Serial number
79415967
Mark type
Stylized text
Filed
18 Dec 2024
Published for opposition
10 Mar 2026
Attorney of record
Heather Smith-Carra

Goods and services

  • Class 009 — Scientific and electric apparatus: Thermal management hardware being electrical devices for thermal management for providing control over airing, ventilation, heating, cooling, and management of the internal volume of electrical panels; recorded software for providing control over airing, ventilation, heating, cooling, and management of the internal volume of electrical panels; thermal controllers, namely, mechanical and electronic thermostats, hygrostats and sensors for temperature and humidity regulation of electrical panels housed in enclosures; resistance heaters being electric control devices for heating management to prevent condensation inside the enclosures; electrical distribution, automation and control panel thermal optimization software, namely, recorded software for controlling electrical distribution, automating machine operations, electrical power, ventilation, heating and cooling, and optimizing thermal performance of control panels
  • Class 011 — Environmental control apparatus: Natural airing and forced ventilation systems, namely, ventilation systems comprised of ventilating fans for household and industrial purposes, electric space cooling apparatus for household and industrial purposes, motors specially adapted therefor, and replacement and structural parts therefor in the nature of outlets, grilles, plastic and metal airing grids, fans, filters, and covers; air to air and air to water heat exchangers, other than parts of machines; cooling units for industrial purposes to control over the temperature inside electrical panels

Owner

Prosecution history

  • 10 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 10 Mar 2026 — PUBLISHED FOR OPPOSITION
  • 04 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 16 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 16 Feb 2026 — EXAMINER'S AMENDMENT ENTERED
  • 16 Feb 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 16 Feb 2026 — EXAMINERS AMENDMENT E-MAILED
  • 16 Feb 2026 — EXAMINERS AMENDMENT -WRITTEN
  • 26 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 26 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 26 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 15 Aug 2025 — REFUSAL PROCESSED BY IB
  • 28 Jul 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 28 Jul 2025 — REFUSAL PROCESSED BY MPU
  • 06 Jun 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

View this trademark record on Marksy