ACCROPODE
Live / Allowed — Published for opposition (as of 03 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 20 Dec 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 79415366
- Mark type
- Stylized text
- Filed
- 20 Dec 2024
- Published for opposition
- 03 Mar 2026
- Attorney of record
- Alexander Lazouski
Goods and services
- Class 019 — Non-metallic building materials: Concrete blocks for the protection of maritime and river works; scale models comprised of concrete of concrete blocks, for laboratory study of hydraulic and wave phenomena in connection with the protection of maritime and river works
- Class 037 — Building construction and repair services: Construction, repair, maintenance of dikes, barriers, breakwaters for the protection of maritime and river works; information, advice, consulting in regard to construction, repair, maintenance of dikes, barriers, breakwaters for the protection of maritime and river works; laying of concrete blocks for the protection of maritime and river works; information, advice, consulting in regard to laying concrete blocks for the protection of maritime and river works; technical support for laying concrete blocks for the protection of maritime and river works; construction of mock-ups being scale models of concrete blocks for laboratory study of hydraulic and wave phenomena in connection with the protection of maritime and river works; Construction supervision being direction of work to construct, repair and maintain dikes, barriers, breakwaters for the protection of maritime and river works; Construction supervision being direction of work to lay concrete blocks for the protection of maritime and river works; construction, repair, maintenance of formworks for making concrete blocks for the protection of maritime and river works; rental of formworks for making concrete blocks for the protection of maritime and river works
Owner
Prosecution history
- 03 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 03 Mar 2026 — PUBLISHED FOR OPPOSITION
- 25 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 06 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 05 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 29 Aug 2025 — REFUSAL PROCESSED BY IB
- 11 Aug 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 11 Aug 2025 — REFUSAL PROCESSED BY MPU
- 27 Jun 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 26 Jun 2025 — NON-FINAL ACTION WRITTEN
- 06 Jun 2025 — ASSIGNED TO EXAMINER
- 07 Feb 2025 — APPLICATION FILING RECEIPT MAILED
- 07 Feb 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED