WEBER MT
Live / Registered — Registered (as of 23 Dec 2025)
What this means for you
Registered since 23 Dec 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79415127
- Registration number
- 8072808
- Mark type
- Design + words
- Filed
- 25 Nov 2024
- Published for opposition
- 04 Nov 2025
- Registered
- 23 Dec 2025
- Attorney of record
- Kenneth A. Knox
Goods and services
- Class 007 — Machines and machine tools: road making machines; construction machinery for soil compaction, namely, earth compacting machines in the nature of vibratory plates, vibratory rammers, reversible soil compactors, vibratory rollers, trench rollers; ground surface finishing and compacting machines; earth compacting machines; vibration motors, except for land vehicles; soil moving apparatus in the nature of earth moving machines; rammers being machines; stone cutting machines; pavement profilers in the nature of cutting machines; machine tools for breaking up road surface material
- Class 009 — Scientific and electric apparatus: equipment, apparatus and instruments for measuring, displaying and monitoring soil compaction and for determining the degree of soil compaction; equipment, apparatus and instruments for determining and indicating the load-bearing capacity of the subsoil; frequency- and voltage-transformers in the nature of mechanical frequency transformers and electric voltage transformers
Owner
Prosecution history
- 23 Mar 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 23 Dec 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 23 Dec 2025 — REGISTERED-PRINCIPAL REGISTER
- 04 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 04 Nov 2025 — PUBLISHED FOR OPPOSITION
- 29 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 02 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 21 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 01 Aug 2025 — REFUSAL PROCESSED BY IB
- 11 Jul 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 11 Jul 2025 — REFUSAL PROCESSED BY MPU
- 18 May 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 17 May 2025 — NON-FINAL ACTION WRITTEN