AZZO TECHNOLOGY COMES TOGETHER
Live / Allowed — Published for opposition (as of 03 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 30 Aug 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 79414872
- Mark type
- Design + words
- Filed
- 30 Aug 2024
- Published for opposition
- 03 Mar 2026
- Attorney of record
- Scott S. Havlick
Goods and services
- Class 009 — Scientific and electric apparatus: Electric control devices for managing electrical energy supplies; electrical control devices for use in electrical energy supply; electrical control devices for electrical energy management; computer-controlled apparatus for remote meter reading; scientific measuring instruments, namely, metering instruments; electronic instruments, namely, power line disturbance analyzers; downloadable computer software; data processing equipment; electric control devices for measuring energy; electric control devices for controlling electricity; apparatus for programming electronic control apparatus; computer operated control apparatus for power management of buildings; electronic control units that control interconnected electrical loads; downloadable computer programs for database management programs; apparatus for monitoring electronic instruments; electric or electronic control modules; data processing and communications apparatus for integrated facilities management; electric meters for measuring values of electrical parameters; electricity meters; power system meters; power meters; computer control apparatus for network management; network management computer software, downloadable; data recorded electronically from the internet
- Class 042 — Scientific and technological services: Design and development of computer software; design and development of automated controller systems, namely, electronic systems; design of computer hardware; design and development of computer hardware for others; information technology (IT) services, namely, computer hardware, software and peripherals design and technical consultancy; advisory services relating to technical diagnostic products; technical data analysis services; advisory services relating to the use of computer software for measuring energy; recording data for others relating to energy consumption in buildings; electrical engineering design services; energy use and conservation consultancy; engineering services in the field of computer software; energy auditing; installation and maintenance of computer software; computer programming; development of test equipment; development of systems for the processing of data; computer database design; design of industrial products, namely, power management products for power distribution systems; engineering project management services for others; monitoring of computer systems by remote access; all of the foregoing being for use in facility management
Owner
- AZZO Pty Ltd, AU
- AZZO Pty Ltd, AU
Prosecution history
- 03 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 03 Mar 2026 — PUBLISHED FOR OPPOSITION
- 26 Feb 2026 — NOTIFICATION PROCESSED BY IB
- 25 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 11 Feb 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 10 Feb 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 03 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 22 Oct 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 20 Oct 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 20 Oct 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 12 Jul 2025 — REFUSAL PROCESSED BY IB
- 20 Jun 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 20 Jun 2025 — REFUSAL PROCESSED BY MPU
- 17 Apr 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 16 Apr 2025 — NON-FINAL ACTION WRITTEN