ZERN ENGINEERING

Live / Applied — Final refusal mailed (as of 06 Oct 2025)

What this means for you

Not registered yet, but its 01 Nov 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79414343
Mark type
Word mark
Filed
01 Nov 2024
Attorney of record
Alexander Lazouski

Goods and services

  • Class 011 — Environmental control apparatus: Steam accumulators; heat accumulators; fans for air-conditioning apparatus; fans for air conditioning installations; electric fans for personal use; air-conditioning installations for vehicles; ventilation installations and apparatus, namely, air-conditioning installations and apparatus; ventilation hoods; ventilation hoods for laboratories; extractor hoods for kitchens; refrigerating containers, namely, refrigerated shipping containers; water heaters; water purification installations; water purifying apparatus and machines; disinfectant apparatus; deodorising apparatus, not for personal use; chimney flues; chimney blowers; humidifiers for central heating radiators; coils as parts of distilling, heating or cooling installations; air valves for steam heating installations; thermostatic valves as parts of heating installations; air-conditioners; air conditioners for vehicles; dampers for furnaces; solar thermal collectors; solar furnaces; hair dryers; drying apparatus and installations, namely, clothes dryers; drying ovens, namely, curing dryers for industrial use; heat pumps; heat generators; heat exchangers, other than parts of machines; ultraviolet lamps, not for medical purposes; air-conditioning installations; electric air dryers; cooling installations for water; cooling installations for liquids, namely, beverage cooling apparatus; refrigerators; refrigerating apparatus and machines, namely, refrigerators; refrigerating appliances and installations

Owner

Prosecution history

  • 06 Oct 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 06 Oct 2025 — FINAL REFUSAL E-MAILED
  • 06 Oct 2025 — FINAL REFUSAL WRITTEN
  • 05 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 05 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 05 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 27 Jun 2025 — REFUSAL PROCESSED BY IB
  • 09 Jun 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 09 Jun 2025 — REFUSAL PROCESSED BY MPU
  • 04 Apr 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 03 Apr 2025 — NON-FINAL ACTION WRITTEN
  • 27 Mar 2025 — ASSIGNED TO EXAMINER
  • 10 Jan 2025 — APPLICATION FILING RECEIPT MAILED
  • 10 Jan 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 09 Jan 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy