ENERTRACK
Live / Registered — Registered (as of 26 Aug 2025)
What this means for you
Registered since 26 Aug 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79413901
- Registration number
- 7910474
- Mark type
- Stylized text
- Filed
- 01 Nov 2024
- Published for opposition
- 08 Jul 2025
- Registered
- 26 Aug 2025
Goods and services
- Class 006 — Metal goods: Pilings of metal; metal spacer brackets; gutter brackets of metal; hardware, namely, metal brackets for general use; metal mounting brackets for general use; brackets of metal for building; common metals, unwrought or semi-wrought; alloys of common metal; girders of metal; window frames of metal; fittings of metal for building, namely, fittings of metal for windows, doors, furniture and pipes; roofing of metal, incorporating solar cells; gutters of metal; metal hardware, namely, springs; metal hardware, namely, washers; metal hardware, namely, nuts; metal hardware, namely, pulleys; wind-driven bird-repelling devices made of metal; wind vanes of metal.
- Class 007 — Machines and machine tools: Elevating work platforms; elevators; industrial robots; electric hand-held drills; pneumatic hand-held drills; electric hand-held hammers; pneumatic hand-held hammers; driving motors, other than for land vehicles; reduction gears other than for land vehicles; gears, other than for land vehicles; reduction gears being parts of machines; speed governors for machines, engines and motors; machine wheelwork; bearings, as parts of machines; dust removing installations for cleaning purposes; electric machines and apparatus for cleaning floors.
Owner
Prosecution history
- 26 Aug 2025 — REGISTERED-PRINCIPAL REGISTER
- 08 Jul 2025 — PUBLISHED FOR OPPOSITION
- 02 Jul 2025 — NOTICE OF PUBLICATION
- 07 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 30 May 2025 — NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
- 29 May 2025 — NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
- 30 Mar 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 29 Mar 2025 — NON-FINAL ACTION WRITTEN
- 27 Mar 2025 — ASSIGNED TO EXAMINER
- 22 Jan 2025 — APPLICATION FILING RECEIPT MAILED
- 22 Jan 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 21 Jan 2025 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 02 Jan 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB