MUNGO
Live / Applied — Non-final action mailed (as of 09 Mar 2026)
What this means for you
Not registered yet, but its 04 Dec 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79413436
- Mark type
- Design + words
- Filed
- 04 Dec 2024
- Attorney of record
- Katrin Lewertoff
Goods and services
- Class 006 — Metal goods: Metal building materials, namely, metal fastening parts being mechanical fastening elements of metal, metal fastening anchors, metal threaded fasteners; metal hardware articles and locksmiths' hardware, namely, mass-produced metal screws and metal workpieces, namely, dowels, bolts, anchors, nails, screws, nuts, rivets, ironwork being iron slabs, iron wire, steel plates and crampons; articles made of metal, namely, metal hardware, namely, washers, metal eye bolts, screw rings of metal, drill bits, cutting discs, bits
- Class 008 — Hand tools: Hand-operated cutting, abrading, riveting tools and stone hammers, hand saws, socket wrenches; hand-operated tools, namely, jackhammers being percussion hammer drills, chipping hammers being masons' hammers, and graving tools
- Class 020 — Furniture: Nonmetallic fastening elements, namely, dowels, bolts, anchors, nails, screws, nuts, rivets, door, bed fittings, blocks being mounting brackets for general use, and spikes comprised primarily of plastic for anchoring and supporting posts; articles of plastic materials, namely, plastic caps, plastic casters
Owner
Prior registrations
Prosecution history
- 09 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 09 Mar 2026 — NON-FINAL ACTION E-MAILED
- 09 Mar 2026 — NON-FINAL ACTION WRITTEN
- 12 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 12 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 12 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 14 Oct 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 08 Aug 2025 — REFUSAL PROCESSED BY IB
- 16 Jul 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 15 Jul 2025 — REFUSAL PROCESSED BY MPU
- 24 May 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 23 May 2025 — NON-FINAL ACTION WRITTEN
- 23 May 2025 — ASSIGNED TO EXAMINER
- 30 Dec 2024 — APPLICATION FILING RECEIPT MAILED
- 30 Dec 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED