PRESTIGE SIGMA

Live / Applied — Extension of time to oppose received (as of 15 Dec 2025)

What this means for you

Not registered yet, but its 14 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79412119
Mark type
Design + words
Filed
14 Oct 2024
Published for opposition
25 Nov 2025
Attorney of record
Moji Onabanjo

Goods and services

  • Class 019 — Non-metallic building materials: Sand, gravel, crushed stone, asphalt, bitumen, cement, gypsum for use in construction, road construction, repair and covering work being jewelry casting; building materials as finished products made of concrete, gypsum, tiles of clay, potters' clay, natural or artificial stone, semi-worked wood, plastic composite blocks and synthetic flooring materials for building, construction, road construction purposes; non-metallic prefabricated buildings, non-metallic building materials, namely, partitions, non-metallic transportable buildings, poles, not of metal for power lines, barriers not of metal for parking areas, doors and window frames of wood and synthetic materials, namely, vinyl doors; traffic signs not of metal, non-luminous and non-mechanical, for roads; monuments and statuettes of stone, concrete and marble; natural and synthetic surface coatings in the form of road marking panels and sheets, being building materials; heat adhesive synthetic surface coating, being building materials in the nature of asphalt roof coating; bitumen cardboard coatings for roofing; bitumen coating for roofing; building glass; prefabricated swimming pools not of metal; aquarium sand

Owner

Prosecution history

  • 15 Dec 2025 — EXTENSION OF TIME TO OPPOSE RECEIVED
  • 25 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 25 Nov 2025 — PUBLISHED FOR OPPOSITION
  • 19 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 28 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 27 Oct 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 27 Oct 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 27 Oct 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 03 Oct 2025 — REFUSAL PROCESSED BY IB
  • 18 Sept 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 18 Sept 2025 — REFUSAL PROCESSED BY MPU
  • 09 Aug 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 08 Aug 2025 — NON-FINAL ACTION WRITTEN
  • 02 Aug 2025 — ASSIGNED TO EXAMINER
  • 01 Aug 2025 — APPLICATION FILING RECEIPT MAILED

View this trademark record on Marksy