CLEAR100+

Live / Registered — Registered (as of 26 Aug 2025)

What this means for you

Registered since 26 Aug 2025. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79411398
Registration number
7910440
Mark type
Stylized text
Filed
09 Oct 2024
Published for opposition
08 Jul 2025
Registered
26 Aug 2025
Attorney of record
Jeffrey M. Becker

Goods and services

  • Class 007 — Machines and machine tools: Hydrogen production apparatus being machines for generating gas by electrolysis.
  • Class 011 — Environmental control apparatus: Hydrogen generation plants being alternative energy generation power plants for industrial purposes; power plants for the generation of power.
  • Class 037 — Building construction and repair services: Construction of green energy power plants utilizing hydrogen gas generated by electrolysis; construction of green hydrogen production plants; construction of power plant facilities utilizing hydrogen gas generated by electrolysis; construction, installation, maintenance and repair services for energy production plants in the nature of alternative energy generation power plants and hydrogen production plants; consulting relating to the construction of power plants containing electrolyzers for producing hydrogen gas.
  • Class 040 — Treatment of materials: Production of hydrogen fuel for third parties via the electrolysis of water; production of green hydrogen fuel for others; custom manufacture of machines for generating gas by electrolysis for utility scale hydrogen projects to the order and specification of others.
  • Class 042 — Scientific and technological services: Providing technical advice in the custom manufacture of hydrogen energy producing machinery.

Owner

Prosecution history

  • 02 Apr 2026 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 15 Mar 2026 — FINAL DISPOSITION NOTICE SENT TO IB
  • 15 Mar 2026 — FINAL DISPOSITION PROCESSED
  • 26 Nov 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 26 Aug 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 26 Aug 2025 — REGISTERED-PRINCIPAL REGISTER
  • 08 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 08 Jul 2025 — PUBLISHED FOR OPPOSITION
  • 02 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 07 Jun 2025 — REFUSAL PROCESSED BY IB
  • 02 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 28 May 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 28 May 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 28 May 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 16 May 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

View this trademark record on Marksy