CLEAR100+
Live / Registered — Registered (as of 26 Aug 2025)
What this means for you
Registered since 26 Aug 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79411398
- Registration number
- 7910440
- Mark type
- Stylized text
- Filed
- 09 Oct 2024
- Published for opposition
- 08 Jul 2025
- Registered
- 26 Aug 2025
- Attorney of record
- Jeffrey M. Becker
Goods and services
- Class 007 — Machines and machine tools: Hydrogen production apparatus being machines for generating gas by electrolysis.
- Class 011 — Environmental control apparatus: Hydrogen generation plants being alternative energy generation power plants for industrial purposes; power plants for the generation of power.
- Class 037 — Building construction and repair services: Construction of green energy power plants utilizing hydrogen gas generated by electrolysis; construction of green hydrogen production plants; construction of power plant facilities utilizing hydrogen gas generated by electrolysis; construction, installation, maintenance and repair services for energy production plants in the nature of alternative energy generation power plants and hydrogen production plants; consulting relating to the construction of power plants containing electrolyzers for producing hydrogen gas.
- Class 040 — Treatment of materials: Production of hydrogen fuel for third parties via the electrolysis of water; production of green hydrogen fuel for others; custom manufacture of machines for generating gas by electrolysis for utility scale hydrogen projects to the order and specification of others.
- Class 042 — Scientific and technological services: Providing technical advice in the custom manufacture of hydrogen energy producing machinery.
Owner
Prosecution history
- 02 Apr 2026 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 15 Mar 2026 — FINAL DISPOSITION NOTICE SENT TO IB
- 15 Mar 2026 — FINAL DISPOSITION PROCESSED
- 26 Nov 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 26 Aug 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 26 Aug 2025 — REGISTERED-PRINCIPAL REGISTER
- 08 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 08 Jul 2025 — PUBLISHED FOR OPPOSITION
- 02 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 07 Jun 2025 — REFUSAL PROCESSED BY IB
- 02 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 May 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 28 May 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 28 May 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 16 May 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB