GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD

Live / Allowed — Approved for publication (as of 02 Apr 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 23 Sept 2024 filing date already counts against anyone who files later.

Record

Serial number
79410677
Mark type
Design + words
Filed
23 Sept 2024
Attorney of record
Lisa K. Shebar

Goods and services

  • Class 009 — Scientific and electric apparatus: Downloadable virtual reality training simulation software in the field of construction; downloadable software for planning, integrating and optimizing applications in the field of construction; photovoltaic installations for producing electricity, namely, photovoltaic solar panels for the production of electricity ; downloadable computer software programs for virtual design and construction (VDC) using building information modeling (BIM) in the field of energy management.
  • Class 037 — Building construction and repair services: Construction project management services; custom construction of buildings; prefabricated building construction; construction of sustainable civil engineering structures; building construction supervision and construction management; installation of building automation equipment; sustainable infrastructure construction, namely, building construction for civil infrastructure projects; installation and maintenance services for photovoltaic installations; installation, repair and maintenance services for networks for distribution of gas, electricity and oil; installation, repair and maintenance services for apparatus and devices for controlling energy consumption; services for the construction, installation, repair and maintenance of geothermal energy based power plants and buildings and installations therefor; renovation and restoration of buildings; building construction of railway infrastructure.
  • Class 039 — Transportation and storage services: Distribution of energy; renewable energy distribution; providing online information and advisory services in the field of energy distribution; distribution and storage services for gas, electricity, fuels, carburants, energy from renewable sources, energy obtained from non-renewable sources; transport and storage services for gas, electricity, fuels, carburants, energy from renewable sources, energy obtained from non-renewable sources; services for the distribution, supply and transmission of energy
  • Class 042 — Scientific and technological services: Architectural services; civil infrastructure design services; civil structural engineering services; design and development of virtual reality software; development of computer programs for simulating sustainable virtual buildings; custom design of prototypes; computer project management services in the field of software systems used for architectural projects; architectural services for building design; engineering testing, namely, testing of apparatus in the field of electrical engineering; industrial testing of engineering structures; environmental testing services; environmental testing and inspection services, namely, monitoring of environmental conditions and activities affecting the structural environment within civil engineering structures; environmental testing and inspection services, namely, monitoring events and human and natural activities that affect environmental conditions within civil engineering structures; technical project planning in the engineering sector; engineering design and computer-aided engineering services for others; analysis of structural behavior of building materials; development of computer programs recorded on data media in the nature of CAD/CAM computer software designed for use in the field of automated construction and manufacturing; computer-aided design services related to building projects; design and development of energy distribution networks; design and development of renewable energy generation systems

Owner

Prosecution history

  • 02 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 02 Apr 2026 — EXAMINER'S AMENDMENT ENTERED
  • 02 Apr 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 02 Apr 2026 — EXAMINERS AMENDMENT E-MAILED
  • 02 Apr 2026 — EXAMINERS AMENDMENT -WRITTEN
  • 04 Feb 2026 — ASSIGNED TO EXAMINER
  • 14 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 14 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 14 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 05 Jul 2025 — REFUSAL PROCESSED BY IB
  • 13 Jun 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 13 Jun 2025 — REFUSAL PROCESSED BY MPU
  • 10 Apr 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 09 Apr 2025 — NON-FINAL ACTION WRITTEN
  • 18 Mar 2025 — ASSIGNED TO EXAMINER

View this trademark record on Marksy