ABACUS
Live / Registered — Registered (as of 21 Oct 2025)
What this means for you
Registered since 21 Oct 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79410499
- Registration number
- 7989051
- Mark type
- Stylized text
- Filed
- 10 Oct 2024
- Published for opposition
- 02 Sept 2025
- Registered
- 21 Oct 2025
- Attorney of record
- Carole Klinger
Goods and services
- Class 007 — Machines and machine tools: Reduction gears being parts of machines; reduction gears other than for land vehicles; gear boxes other than for land vehicles; machine elements not for land vehicles, namely, power transfers in the nature of power transmissions for machines, electric generators and gearing for machines not for land vehicles; AC motors and DC motors, not for land vehicles
- Class 009 — Scientific and electric apparatus: Precision measuring machines and instruments, namely, interferometers, angle gauges and surface roughness testing machines and instruments; power controllers; downloadable computer software and hardware for controlling and operating reduction gears and electric motors; computers
- Class 012 — Vehicles: Reduction gears, being machine elements for land vehicles; reduction gears for land vehicles; gear boxes for land vehicles; machine elements for land vehicles, namely, power transmissions and gearings for land vehicles; AC motors and DC motors for land vehicles not including their parts
Owner
Prosecution history
- 21 Jan 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 21 Oct 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 21 Oct 2025 — REGISTERED-PRINCIPAL REGISTER
- 02 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Sept 2025 — PUBLISHED FOR OPPOSITION
- 27 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 04 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 28 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 28 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 06 Jun 2025 — REFUSAL PROCESSED BY IB
- 11 May 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 11 May 2025 — REFUSAL PROCESSED BY MPU
- 22 Mar 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 21 Mar 2025 — NON-FINAL ACTION WRITTEN