TUNNEL RENEWAL STRATEGY GRUPPO AUTOSTRADE PER L'ITALIA
Live / Applied — Response to non-final action entered (as of 13 Mar 2026)
What this means for you
Not registered yet, but its 25 Jul 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79409877
- Mark type
- Design + words
- Filed
- 25 Jul 2024
- Attorney of record
- Erica L. Tritt
Goods and services
- Class 037 — Building construction and repair services: Construction services relating to the preparation, control, supervision, creation and monitoring of construction projects, in particular in the fields of road and street construction; construction of road tunnels and highways; construction of tunnels; infrastructure construction, namely, building construction for civil infrastructure projects; consultancy services and information services, in relation to construction of road tunnels and highways; building construction supervision, especially in the fields of construction of road tunnels and highways; consultancy relating to residential construction and building construction; restoration of architectural works being building restoration; renovation and repair of roadworks; demolition of buildings
- Class 042 — Scientific and technological services: Building design services; civil engineering planning services; construction drafting, in particular design of road tunnels and highways; engineering drawing services; architectural design; industrial design; conducting technical project studies, in the fields of construction of road tunnels and highways; technical project planning, in the fields of construction of road tunnels and highways; construction engineering services in the nature of design and construction projects; designing and conducting feasibility studies in the field of building design; conducting of technical feasibility studies in the field of building design; engineering consultancy services; civil engineering consultancy; consultancy in the field of construction design of road tunnels and highways
Owner
Prosecution history
- 13 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 13 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 13 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 12 Mar 2026 — TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
- 12 Mar 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 12 Mar 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 12 Mar 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 12 Mar 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 10 Oct 2025 — REFUSAL PROCESSED BY IB
- 20 Sept 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 20 Sept 2025 — REFUSAL PROCESSED BY MPU
- 12 Aug 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 11 Aug 2025 — NON-FINAL ACTION WRITTEN
- 31 Jul 2025 — ASSIGNED TO EXAMINER
- 30 Jul 2025 — APPLICATION FILING RECEIPT MAILED