CARAVENT
Live / Registered — Registered (as of 28 Oct 2025)
What this means for you
Registered since 28 Oct 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79409709
- Registration number
- 7998489
- Mark type
- Word mark
- Filed
- 25 Sept 2024
- Published for opposition
- 09 Sept 2025
- Registered
- 28 Oct 2025
- Attorney of record
- Thomas F. Bergert
Goods and services
- Class 011 — Environmental control apparatus: Electric fans; ventilating fans for industrial use; ventilating fans for commercial use; electric fans for use in industrial production and processing; electric fans for industrial drying processes; electric fans for industrial processing in the chemical industry; electric fans for industrial deaerating processes; electric extraction fans for industrial dedusting processes; electric fans for use in dedusting installations; electric fans for the purpose of circulating of air and gas fluids in industrial installations; electric fans for use in heat treatment installations; electric fans for use in industrial comminution processes; electric fans for use in industrial milling and grinding processes; explosion resistant electric fans; gas tight electric fans; electric fans having rubber coated internal surfaces and reduced noise electric fans having integrated sound proofing; and replacement parts for the aforesaid goods.
Owner
Prosecution history
- 28 Jan 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 28 Oct 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 28 Oct 2025 — REGISTERED-PRINCIPAL REGISTER
- 03 Oct 2025 — CORRECTION TRANSACTION RECEIVED FROM IB
- 09 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 09 Sept 2025 — PUBLISHED FOR OPPOSITION
- 03 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 11 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 08 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 08 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 08 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 31 May 2025 — REFUSAL PROCESSED BY IB
- 05 May 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 05 May 2025 — REFUSAL PROCESSED BY MPU
- 20 Mar 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW