SOLARSAGA
Live / Registered — Registered (as of 15 Jul 2025)
What this means for you
Registered since 15 Jul 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79407896
- Registration number
- 7862674
- Mark type
- Word mark
- Filed
- 15 Jul 2024
- Published for opposition
- 27 May 2025
- Registered
- 15 Jul 2025
- Attorney of record
- Roberta L. Christensen
Goods and services
- Class 006 — Metal goods: Buildings, transportable, of metal; framework of metal for building; fittings of metal for building, namely, fittings of metal for pipes and fittings of metal for windows; roofing of metal, incorporating photovoltaic cells; roofing of metal; buildings of metal, namely, prefabricated metal buildings, portable metal buildings, transportable metal buildings; pantiles of metal; roofing tiles of metal; tiles of metal for building; mounting frames of metal for solar panels; roof coverings of metal; roof flashing of metal.
- Class 019 — Non-metallic building materials: Tiles, not of metal, for building; non-metal roofing shingles; roofing tiles, not of metal; pantiles, not of metal; flashing, not of metal, for building; roofing, not of metal, incorporating photovoltaic cells; roof coverings, not of metal; roofing, not of metal; roof flashing, not of metal; mounting frames, not of metal, for solar panels.
- Class 037 — Building construction and repair services: Roofing services; electric appliance installation and repair; machinery installation, maintenance and repair; repair of power lines; rental of portable power chargers; rental of battery chargers; motor vehicle maintenance and repair; vehicle maintenance; vehicle battery charging; roofing repair; installation and maintenance of photovoltaic installations; installation of electricity and power generating equipment.
Owner
Prosecution history
- 23 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 23 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 26 Feb 2026 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 11 Feb 2026 — FINAL DISPOSITION NOTICE SENT TO IB
- 11 Feb 2026 — FINAL DISPOSITION PROCESSED
- 15 Oct 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 15 Jul 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 15 Jul 2025 — REGISTERED-PRINCIPAL REGISTER
- 27 May 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 27 May 2025 — PUBLISHED FOR OPPOSITION
- 21 May 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 17 May 2025 — REFUSAL PROCESSED BY IB
- 24 Apr 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Apr 2025 — EXAMINER'S AMENDMENT ENTERED
- 24 Apr 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED