HYDRO-PAQ
Live / Registered — Registered (as of 13 Jan 2026)
What this means for you
Registered since 13 Jan 2026. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79407728
- Registration number
- 8097731
- Mark type
- Stylized text
- Filed
- 12 Aug 2024
- Published for opposition
- 25 Nov 2025
- Registered
- 13 Jan 2026
- Attorney of record
- Elias Hantula
Goods and services
- Class 037 — Building construction and repair services: construction information services; construction project management services; construction grading services; building construction services; machinery installation, maintenance and repair; leasing of building machinery; rental of building construction machinery
- Class 040 — Treatment of materials: Wastewater treatment services; treatment of metal; treatment of materials in the nature of silicon; treatment of materials in the nature of epoxy resin; treatment of materials in the nature of polymers; treatment of materials in the nature of plastics
- Class 042 — Scientific and technological services: Engineering services in the field of water and wastewater treatment systems; engineering design services; engineering consultancy; custom design and development of industrial machinery
Owner
- BW WATER PTE. LTD., SG
- BW WATER PTE. LTD., SG
- BW WATER PTE. LTD., SG
Prosecution history
- 23 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 23 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 13 Jan 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 13 Jan 2026 — REGISTERED-PRINCIPAL REGISTER
- 25 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 25 Nov 2025 — PUBLISHED FOR OPPOSITION
- 19 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 27 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 10 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 10 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 10 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Apr 2025 — REFUSAL PROCESSED BY IB
- 02 Apr 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 02 Apr 2025 — REFUSAL PROCESSED BY MPU
- 27 Feb 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW