ARABELLE SOLUTIONS
Dead / Abandoned — Abandoned — failure to respond (as of 17 Feb 2026)
What this means for you
This application is over — abandoned 21 Jul 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79406782
- Mark type
- Stylized text
- Filed
- 29 May 2024
- Abandoned
- 21 Jul 2025
Goods and services
- Class 007 — Machines and machine tools: Nuclear turbines; turbine-alternators; industrial turbines; alternators; AC generators (alternators); moisture separator reheaters being parts of machines.
- Class 037 — Building construction and repair services: Construction, installation, commissioning, servicing, maintenance, repair and renovation of equipment in the machine room of nuclear reactors, namely nuclear turbines, turbine-alternators, industrial turbines, alternators, alternating current generators (alternators), moisture separator reheaters, and control and monitoring equipment thereof; providing information, providing advice and commissioning of the the machine room of nuclear reactors.
- Class 042 — Scientific and technological services: Engineering services for the design, construction, installation, commissioning, servicing, maintenance, repair and renovation of equipment in the machine room of nuclear reactors, namely nuclear turbines, turbine-alternators, industrial turbines, alternators, alternating current generators (alternators), moisture separator reheaters, and control and monitoring equipment thereof; technical inspections and appraisals of installations and equipment in the field of nuclear energy generation and particularly nuclear reactors.
Owner
Prosecution history
- 02 Apr 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 16 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 16 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 17 Feb 2026 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 17 Feb 2026 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 12 Jun 2025 — CHANGE OF OWNER RECEIVED FROM IB
- 09 Feb 2025 — REFUSAL PROCESSED BY IB
- 23 Jan 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 18 Jan 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 18 Jan 2025 — REFUSAL PROCESSED BY MPU
- 22 Dec 2024 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 21 Dec 2024 — NON-FINAL ACTION WRITTEN
- 11 Dec 2024 — ASSIGNED TO EXAMINER
- 18 Oct 2024 — APPLICATION FILING RECEIPT MAILED
- 18 Oct 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED