FAENZA
Live / Registered — Registered (as of 04 Feb 2025)
What this means for you
Registered since 04 Feb 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79405621
- Registration number
- 7674502
- Mark type
- Word mark
- Filed
- 25 Oct 2023
- Published for opposition
- 17 Dec 2024
- Registered
- 04 Feb 2025
- Attorney of record
- Yaling Zhou
Goods and services
- Class 011 — Environmental control apparatus: Anti-splash tap nozzles; Taps for pipes and pipelines being parts of sanitary installations; Cocks for pipes and pipelines being parts of sanitary installations; Water distribution installations, namely, water pipes being parts of sanitary facilities; Pipes being parts of sanitary facilities; Water-pipes, namely taps for pipes and pipelines being parts of sanitary installations; Water conduits installations, namely, water pipes being parts of sanitary facilities; Water fountains; Pressure water purification tanks; Taps being faucets; washers for water taps; mixer taps for water pipes; Regulating and safety accessories for water apparatus, namely, metered valves for regulating water supply in water plumbing apparatus; Water intake apparatus, namely sink traps for plumbing fixtures; expansion tanks for central heating installations; underfloor heating apparatus and installations; floor drains; pipe steam valve for water heating equipment; Pipe water valves, namely water control valves being parts of water heating installations; pipe steam valves being parts of water heating installations; flexible pipes being parts of shower plumbing installations; flexible pipes being parts of bath plumbing installations; water control valves for faucets; single-lever faucets for sinks; faucet aerators; drinking fountains; flexible pipes being parts of sink plumbing installations; bidet taps; underfloor heating apparatus; flexible pipes being parts of basin plumbing installations; Taps being faucets for wash-hand basins; faucet handles; automatic faucets; Hot air bath fittings, namely bathroom heater; bath tubs; bath tubs for sitz baths; Bath fittings, namely bathroom plumbing drains; heaters for baths; bath installations; Bath plumbing fixtures, namely shower sprayers; bidets; toilets, portable; Flushing toilet tanks; Toilets being water-closets; Showers; Wash-hand basins being parts of sanitary installations; Wash-hand bowls being parts of sanitary installations; Level controlling flushometer valves in toilet tanks; Sanitary apparatus and installations, namely steam rooms; Hand drying apparatus, namely, hand dryers for washrooms; toilet bowls; toilet seats; tanning beds; flushing apparatus; water flushing installations; fumigation apparatus, not for medical purposes; Spa baths in the nature of bath tubs; sauna bath installations; shower cubicles; sinks; steam facial apparatus; urinals being sanitary fixtures; Whirlpool-jet apparatus, namely taps for pipes and pipelines being parts of sanitary installations; sanitary installations, namely, clean chambers; hydromassage bath apparatus; microbubble generators for baths; towel steamers; electric towel warmers; heat sinks for use in heating apparatus; bath boilers; shower heads; shower panels; shower trays; electrically heated towel rails; foot baths, electric; kitchen sinks; hand-held showers; toilet tank balls; whirlpool bathtubs; toilet bowls with integrated bidet water jets; electric hand drying apparatus for washrooms; child safety protective covers for bathtub spouts; portable foot baths; toilet seats for children; toilet bowls for children; bath tub jets; vanity top sinks; shower mixing valves; electric hot air hand dryers; hand dryers; bath screens; tanning booths; shower cubicles; hot tub jets; flush handles for toilets.
Owner
Prosecution history
- 19 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 02 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 02 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 05 Sept 2025 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 19 Aug 2025 — FINAL DISPOSITION NOTICE SENT TO IB
- 19 Aug 2025 — FINAL DISPOSITION PROCESSED
- 05 May 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 04 Feb 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 04 Feb 2025 — REGISTERED-PRINCIPAL REGISTER
- 17 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 17 Dec 2024 — PUBLISHED FOR OPPOSITION
- 11 Dec 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 23 Nov 2024 — REFUSAL PROCESSED BY IB
- 19 Nov 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 19 Nov 2024 — EXAMINER'S AMENDMENT ENTERED