FLEXI-FLOW
Live / Allowed — Published for opposition (as of 24 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 23 May 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 79403351
- Mark type
- Stylized text
- Filed
- 23 May 2024
- Published for opposition
- 24 Mar 2026
- Attorney of record
- Thomas J. Romano
Goods and services
- Class 009 — Scientific and electric apparatus: Calibration equipment, namely, calibration devices for calibrating apparatus for analyzing and testing the flow of gases, in the nature of gaseous compounds, not being natural gas or methane; apparatus and instruments for measuring, weighing, displaying, regulating and dosing the flow of gases in the nature of gaseous compounds, not being natural gas or methane, namely, sensors for measuring gas flow and the physical properties of gases, not for medical use, electric automatic gas flow control machines and instruments, and gas flow meters, and electronic valves for controlling gases; measuring devices for measuring, regulating and dosing the flow of gases in the nature of gaseous compounds, not being natural gas or methane, namely, sensors for measuring gas flow and the physical properties of gases; multiparameter flow meters for gases in the nature of gaseous compounds, not being natural gas or methane; mass flow meters for gases in the nature of gaseous compounds, not being natural gas or methane; measuring devices for calibrating the flow of gases in the nature of gaseous compounds, not being natural gas or methane, namely, gas flow meters; none of the foregoing being for use with oil and gas pipelines or for use with natural gas or methane
Owner
- Berkin B.V., NL
- Berkin B.V., NL
Prosecution history
- 24 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Mar 2026 — PUBLISHED FOR OPPOSITION
- 18 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 03 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 12 Feb 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 27 Jan 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 27 Jan 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 23 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 23 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 23 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 10 Oct 2025 — REFUSAL PROCESSED BY IB
- 17 Sept 2025 — NON-FINAL ACTION WRITTEN
- 07 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 07 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 07 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED