FLOORFINDER.
Dead / Abandoned — Abandoned — failure to respond (as of 23 Apr 2025)
What this means for you
This application is over — abandoned 08 Apr 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79402608
- Mark type
- Word mark
- Filed
- 12 Mar 2024
- Abandoned
- 08 Apr 2025
Goods and services
- Class 001 — Chemicals: Reactive synthetic resins and/or polymer materials for coating systems and casting compounds as far as they are included in this class; chemical products for industrial purposes, in particular chemical products for the construction industry, except for asphalt and asphalt repair compounds and not for civil engineering.
- Class 019 — Non-metallic building materials: Building materials, not of metal, for industrial floor coverings and sports floor coverings; floor screed, especially synthetic resin floor screed; chemical floor coatings, in particular containing synthetic resins and/or polymer materials; all of the aforementioned goods except asphalt and asphalt repair compounds and not for civil engineering.
- Class 037 — Building construction and repair services: Services in the field of construction, namely sealing, impregnating, coating floors, walls and ceilings; services in the field of construction, namely creating and laying floors and casting compounds.
- Class 040 — Treatment of materials: Custom manufacturing of polymer concrete bound with reaction synthetic resins for structures, foundations, frames, supports, model molds, molding compounds in mechanical engineering and/or machine tool construction and/or model construction.
Owner
Prosecution history
- 05 Feb 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 21 Jan 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 21 Jan 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 23 Apr 2025 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 23 Apr 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 26 Oct 2024 — REFUSAL PROCESSED BY IB
- 07 Oct 2024 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 07 Oct 2024 — REFUSAL PROCESSED BY MPU
- 01 Oct 2024 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 30 Sept 2024 — NON-FINAL ACTION WRITTEN
- 23 Sept 2024 — ASSIGNED TO EXAMINER
- 23 Aug 2024 — APPLICATION FILING RECEIPT MAILED
- 23 Aug 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 22 Aug 2024 — SN ASSIGNED FOR SECT 66A APPL FROM IB