PYROPOWER

Dead / Abandoned — Abandoned — failure to respond (as of 31 Mar 2025)

What this means for you

This application is over — abandoned 13 Mar 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79394483
Mark type
Stylized text
Filed
06 Feb 2024
Abandoned
13 Mar 2025

Goods and services

  • Class 007 — Machines and machine tools: Machines for energy recovery and installations for energy production; current generators and electricity generating installations; power generators.
  • Class 037 — Building construction and repair services: Installation, maintenance and repair of energy production plants and machines.
  • Class 040 — Treatment of materials: Electricity generating; generation of power; rental of generators; power plant, photovoltaic installations and photovoltaic power plants, installations for renewable energy generation, solar installations, geothermal installations, pumped storage installations, and cooling and heating installations.
  • Class 042 — Scientific and technological services: Engineering; engineering services; mechanical engineering; conducting technical project studies; technical project planning; technological consultancy; technical research; quality control; scientific and technological services and research and design relating thereto; industrial analysis and research services.

Owner

Prosecution history

  • 31 Mar 2026 — FINAL DISPOSITION NOTICE SENT TO IB
  • 31 Mar 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 10 Oct 2025 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 24 Sept 2025 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 24 Sept 2025 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 31 Mar 2025 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 31 Mar 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 07 Oct 2024 — REFUSAL PROCESSED BY IB
  • 12 Sept 2024 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 12 Sept 2024 — REFUSAL PROCESSED BY MPU
  • 10 Sept 2024 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 09 Sept 2024 — NON-FINAL ACTION WRITTEN
  • 29 Aug 2024 — ASSIGNED TO EXAMINER
  • 09 May 2024 — APPLICATION FILING RECEIPT MAILED
  • 09 May 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Marksy