PYROPOWER
Dead / Abandoned — Abandoned — failure to respond (as of 31 Mar 2025)
What this means for you
This application is over — abandoned 13 Mar 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79394483
- Mark type
- Stylized text
- Filed
- 06 Feb 2024
- Abandoned
- 13 Mar 2025
Goods and services
- Class 007 — Machines and machine tools: Machines for energy recovery and installations for energy production; current generators and electricity generating installations; power generators.
- Class 037 — Building construction and repair services: Installation, maintenance and repair of energy production plants and machines.
- Class 040 — Treatment of materials: Electricity generating; generation of power; rental of generators; power plant, photovoltaic installations and photovoltaic power plants, installations for renewable energy generation, solar installations, geothermal installations, pumped storage installations, and cooling and heating installations.
- Class 042 — Scientific and technological services: Engineering; engineering services; mechanical engineering; conducting technical project studies; technical project planning; technological consultancy; technical research; quality control; scientific and technological services and research and design relating thereto; industrial analysis and research services.
Owner
Prosecution history
- 31 Mar 2026 — FINAL DISPOSITION NOTICE SENT TO IB
- 31 Mar 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 10 Oct 2025 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 24 Sept 2025 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 24 Sept 2025 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 31 Mar 2025 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 31 Mar 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 07 Oct 2024 — REFUSAL PROCESSED BY IB
- 12 Sept 2024 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 12 Sept 2024 — REFUSAL PROCESSED BY MPU
- 10 Sept 2024 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 09 Sept 2024 — NON-FINAL ACTION WRITTEN
- 29 Aug 2024 — ASSIGNED TO EXAMINER
- 09 May 2024 — APPLICATION FILING RECEIPT MAILED
- 09 May 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED