VECTOR ENERGY

Dead / Abandoned — Abandoned — failure to respond (as of 28 Apr 2025)

What this means for you

This application is over — abandoned 19 Feb 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79389406
Mark type
Design + words
Filed
27 Dec 2023
Abandoned
19 Feb 2025

Goods and services

  • Class 009 — Scientific and electric apparatus: Electrical energy control apparatus; regulated power supply apparatus; apparatus for monitoring electricity consumption; energy banks; power modules; industrial automation controls; factory automation software; software for robotic process automation [ RPA ]; electric installations for the remote control of industrial operations; industrial controls incorporating software; solar panels; solar panel sets; photovoltaic apparatus and installations for generating solar electricity; solar battery packs; solar cells for electricity generation; solar energy collectors for electricity generation; inverters (electricity); photovoltaic inverters; inverter controllers; charging stations for electric vehicles; multifunctional remote controls; programmable control apparatus; regulators (electric); power relays; power capacitors; transformers [electricity]; power testers; measures; software; computer applications for solar-panel installation control and management; downloadable computer applications
  • Class 035 — Advertising and business services: Commercial business management, organization and administration; advice to industrial companies regarding the management of their business; industrial management consultancy including cost/performance analysis; corporate efficiency advice; all of the foregoing linked to the field of energy management in industrial manufacturing processes, automation in industrial manufacturing processes and control systems in industrial manufacturing processes
  • Class 042 — Scientific and technological services: Scientific and technological services, as well as associated research and design services; industrial analysis, industrial research and industrial design services; quality control and authentication services; hardware and software design and development; Consultancy regarding energy-saving; technical advice in connection with energy-saving measures; development of energy and electricity management systems; design and development of renewable energy generation systems; research in the field of energy; advisory services relating to energy consumption; research relating to the computerized automation of industrial processes; research relating to computerized automation of technical processes; quality control testing of industrial machinery

Owner

Prosecution history

  • 26 Feb 2026 — LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
  • 01 Aug 2025 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 14 Jul 2025 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 14 Jul 2025 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 28 Apr 2025 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 28 Apr 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 21 Feb 2025 — LIMITATION OF GOODS RECEIVED FROM IB
  • 08 Sept 2024 — REFUSAL PROCESSED BY IB
  • 19 Aug 2024 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 18 Aug 2024 — REFUSAL PROCESSED BY MPU
  • 09 Aug 2024 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 08 Aug 2024 — NON-FINAL ACTION WRITTEN
  • 25 Jul 2024 — ASSIGNED TO EXAMINER
  • 27 Feb 2024 — APPLICATION FILING RECEIPT MAILED
  • 22 Feb 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Marksy