EASYMELT
Live / Registered — Registered (as of 16 Dec 2025)
What this means for you
Registered since 16 Dec 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79381197
- Registration number
- 8063899
- Mark type
- Design + words
- Filed
- 22 Aug 2023
- Published for opposition
- 28 Oct 2025
- Registered
- 16 Dec 2025
- Attorney of record
- Jeffrey H. Handelsman
Goods and services
- Class 006 — Metal goods: Common metals and their alloys, ores of metal; metal materials for building and construction, namely, building panels of metal, frames of metal for building, building boards of metal in the field of metallurgical industry and in the field of industrial furnaces; transportable buildings of metal; non-electric cables and wires of common metal; metal containers for storage or transport; furnace fireguards of metal; furnace screens of metal; refractory furnace linings of metal; all the aforementioned products used in the field of metallurgical and iron and steel industry
- Class 007 — Machines and machine tools: Steel and metalworking machines, namely, blast furnaces and sorting machines for industrial use; furnace loading machines; machines used in the field of industrial furnaces; mixers for furnace repair materials; machine tools used in the metallurgical and iron and steel industry
- Class 011 — Environmental control apparatus: Blast furnaces; Hot blast furnaces for industrial purposes; gas burners for industrial purposes, industrial boilers and industrial heaters; combustion furnaces; industrial furnaces; casting furnaces; refractory furnaces; smelting furnaces; induction furnaces; shaped fittings for blast furnaces; furnaces for melting metals; electric furnaces for metallurgical purposes; electric furnaces for industrial use
- Class 037 — Building construction and repair services: Installation, maintenance and repair of industrial furnaces; providing information relating to the repair or maintenance of industrial furnaces; furnace rebricking and rebuilding; installation and repair of furnaces and smelters; construction of industrial furnaces; providing information relating to the repair and maintenance of industrial furnaces
- Class 040 — Treatment of materials: Treatment of materials, namely, briquetted iron in the field of metallurgical industry; Leasing of energy generating equipment; Processing of iron oxides; Treatment of slag arising from metal casting; Heat treatment of ores; sorting and transformation of waste and recyclable materials; metal melting services; gas processing services; all the aforementioned services provided in the field of metallurgical and iron and steel industry
- Class 042 — Scientific and technological services: Scientific and technological services, namely, scientific research, analysis, testing, design, engineering and development in the industrial and metallurgical field; industrial analysis and research services in the field of iron and steel industry and the ferrous and non-ferrous metal-working industry; design and development of computer hardware and software for use in the metallurgical industry; technical research in the field of metallurgical processes in blast furnaces
Owner
- PAUL WURTH S.A., LU
- PAUL WURTH S.A., LU
- PAUL WURTH S.A., LU
Prosecution history
- 16 Mar 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 16 Dec 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 16 Dec 2025 — REGISTERED-PRINCIPAL REGISTER
- 28 Oct 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 28 Oct 2025 — PUBLISHED FOR OPPOSITION
- 22 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 27 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 15 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 15 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 15 Sept 2025 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 03 May 2025 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 16 Apr 2025 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 16 Apr 2025 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 14 Mar 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 14 Mar 2025 — FINAL REFUSAL E-MAILED