SIGG
Dead / Abandoned — Abandoned — failure to respond (as of 06 Sept 2024)
What this means for you
This application is over — abandoned 07 Aug 2024. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79374999
- Mark type
- Word mark
- Filed
- 05 Apr 2023
- Abandoned
- 07 Aug 2024
Goods and services
- Class 009 — Scientific and electric apparatus: Inverters (electricity); batteries (cells); electric converters; solar panels for electricity production; battery chargers; electrical condensers capacitors; current rectifiers; electric relays; converters for electric plugs; ionization apparatus not for the treatment of air or water
- Class 011 — Environmental control apparatus: Apparatus and installations for lighting; portable electric radiators; thermal-conversion solar collectors [heating]; heat-accumulating stoves; electric fans for personal use; electric hot-water bottles; refrigeration installations and machines; heating apparatus; sanitary apparatus and installations; ionization apparatus for the treatment of air or water
- Class 037 — Building construction and repair services: Electric appliance installation and repair; Machinery installation, maintenance and repair; provision of information with respect to repair and maintenance related to the aforesaid goods; heating equipment installation and repair; interference suppression in electrical apparatus; vehicle battery charging; rustproofing; maintenance of power lines; construction services; installation and maintenance of photovoltaic installations
- Class 042 — Scientific and technological services: Consultancy in the field of energy-saving; Research in the field of environmental protection; technical research; quality control; chemical research; material testing; industrial design services; computer programming; graphic arts design services; architectural services
Owner
Prosecution history
- 14 Aug 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 10 Jan 2025 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 22 Dec 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 19 Dec 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 19 Dec 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 06 Sept 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 06 Sept 2024 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 27 Feb 2024 — REFUSAL PROCESSED BY IB
- 06 Feb 2024 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 06 Feb 2024 — REFUSAL PROCESSED BY MPU
- 20 Jan 2024 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 19 Jan 2024 — NON-FINAL ACTION WRITTEN
- 02 Jan 2024 — ASSIGNED TO EXAMINER
- 31 Dec 2023 — NEW REPRESENTATIVE AT IB RECEIVED
- 06 Nov 2023 — LIMITATION FROM THE IB EXAMINED AND ENTERED