ECCU
Live / Registered — Registered (as of 03 Sept 2024)
What this means for you
Registered since 03 Sept 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79372949
- Registration number
- 7490710
- Mark type
- Stylized text
- Filed
- 19 Apr 2023
- Published for opposition
- 18 Jun 2024
- Registered
- 03 Sept 2024
- Attorney of record
- Scott S. Havlick
Goods and services
- Class 007 — Machines and machine tools: Generators, namely, electricity generators; pumps for machines; hydraulic turbines, other than for land vehicles; wind turbines; disintegrators for chemical processing; conveyors being machines; heat exchangers being parts of machines; steam turbines, other than for land vehicles; gas turbines, not for land vehicles; all of the foregoing goods being for use in the energy industry and in connection with energy generating plants; power plant components, namely, electricity generators, air-cooled condensers, electrolysis machines for generating hydrogen, electrolysis machines for generating hydrogen and gas/hydrogen mixtures, and machine systems and subsystems for the production of energy, especially in the form of hydrogen, comprised of electrolysis machines for generating hydrogen obtained from alternative energy sources
- Class 040 — Treatment of materials: Processing of fuels; emission-processing services, namely, carbon capture for others; waste treatment services; refining of fuels; production and treatment of fuels for others; production of energy; production of hydrogen and hydrogen processing services; production of methane and methane processing services; production of electricity; production of heat by means of electricity generation for energy use; combined production of electricity and heat; consultancy in relation to the aforesaid services; capture and treatment of carbon dioxide for others
- Class 042 — Scientific and technological services: Scientific and technological services and research and design relating thereto, namely, scientific and technological research and new product design, all in the fields of producing and processing fuels, energy, hydrogen, methane, electricity and heat; industrial analysis and research services in the field of energy generation technology; design and development of computer hardware and software; technical monitoring services, namely, remote monitoring of equipment for producing and processing fuels, energy, hydrogen, methane, electricity and heat to ensure proper functioning; energy auditing; inspection of power generation, storage, and distribution apparatus and machinery for quality control purposes; engineering consultancy; engineering services for power plants and industrial production facilities; information, consultancy and advisory services relating to engineering services in the field of energy efficiency; technical supervision services, namely, computer project management services; remote monitoring of power plants to ensure proper functioning; design services, namely, design of new products for others; hosting of computer websites; computer analysis and consulting services in the field of computer programs and computer software; design and testing of process automation equipment systems and computer hardware and software systems related thereto; computer modelling and computer simulation of power plants and processes; development, updating and maintenance of software and database systems; maintenance of database software systems
Owner
- Westenergy Oy, FI
- Westenergy Oy, FI
- Westenergy Oy, FI
Prosecution history
- 03 Sept 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 03 Sept 2024 — REGISTERED-PRINCIPAL REGISTER
- 18 Jun 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 18 Jun 2024 — PUBLISHED FOR OPPOSITION
- 29 May 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 16 May 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 16 May 2024 — EXAMINER'S AMENDMENT ENTERED
- 16 May 2024 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 16 May 2024 — EXAMINERS AMENDMENT E-MAILED
- 16 May 2024 — EXAMINERS AMENDMENT -WRITTEN
- 29 Mar 2024 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 29 Mar 2024 — FINAL REFUSAL E-MAILED
- 29 Mar 2024 — FINAL REFUSAL WRITTEN
- 04 Mar 2024 — REFUSAL PROCESSED BY IB
- 27 Feb 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED