H2 PRG SYSTEM

Live / Applied — Suspended — suspension check completed, case still suspended (as of 28 Jan 2025)

What this means for you

Not registered yet, but its 22 Feb 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79370274
Mark type
Stylized text
Filed
22 Feb 2023
Attorney of record
Sangwon Kim

Goods and services

  • Class 007 — Machines and machine tools: Hydrogen compressors; electric compressors; electricity generators; gas operated power generators; hydrogen operated power generators; electricity generators using hydrogen as a raw material; gas pumps for service stations; hydrogen fuel pumps for service stations; machines for generating hydrogen by electrolysis; hydrogen dispensing pumps for service stations; hydrogen dispensing pumps for hydrogen fuel cell electric vehicles for use in service stations; hydrogen quick dispensing pumps for service stations; electric power generators using hydrogen; hydrogen dispensing apparatus being hydrogen fuelling pumps for service stations; machines for generating hydrogen and oxygen by electrolysis
  • Class 037 — Building construction and repair services: IInstallation, maintenance and repair of hydrogen gas charger; installation of apparatus for supply and distribution of gas; emergency servicing of gas supply apparatus; installation, maintenance and repair of apparatus for supplying gas; installation of apparatus for generating power; maintenance, servicing and repair of apparatus and installations for generating power; maintenance and repair of remote control apparatus; installation of renewable energy conversion installations; maintenance and installation of hydrogen charging station; installation of hydrogen charging station

Owner

Prosecution history

  • 31 Jan 2026 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
  • 29 Jul 2025 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
  • 28 Jan 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
  • 16 Jan 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
  • 09 Nov 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 23 Oct 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 23 Oct 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 04 Mar 2024 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
  • 04 Mar 2024 — LETTER OF SUSPENSION E-MAILED
  • 04 Mar 2024 — SUSPENSION LETTER WRITTEN
  • 30 Jan 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 30 Jan 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 30 Jan 2024 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 02 Jan 2024 — REFUSAL PROCESSED BY IB
  • 14 Dec 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

View this trademark record on Marksy