ORAMA MINIMAL FRAMES
Live / Applied — Opposition pending (as of 07 Oct 2024)
What this means for you
Not registered yet, but its 09 Feb 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79366556
- Mark type
- Design + words
- Filed
- 09 Feb 2023
- Published for opposition
- 04 Jun 2024
- Attorney of record
- CHRISTOPHER ERICKSON
Goods and services
- Class 006 — Metal goods: Pot hooks of metal; buckles of common metal being hardware; aluminium wire; cramps of metal; hoop iron; metal tie plates; springs being metal hardware; stops of metal being metal door stops, metal gate stops, metal cabinet stops; fittings of metal for windows; door fittings, of metal; sash fasteners of metal for windows; silver-plated tin alloys; linings of metal for building; gates of metal; armor plating of metal; armored doors of metal; foundry chill-molds; nails; metal pins being hardware; transportable buildings of metal; reinforcing materials of metal for building; guard rails of metal; sheets and plates of metal namely sheets of metal, door plates of metal; metal window fasteners; metal door frames; grids of metal being metal wall panels; door knockers of metal; porches of metal for building; metal building materials, namely soffits, fascia; wainscoting of metal; ceilings of metal being metal ceiling tiles, metal ceiling panels, coverings of metal for ceilings; slabs of metal for building; paving slabs of metal; duckboards of metal; metal ladders; roofing of metal, incorporating photovoltaic cells; metal roofing; shutters of metal; metal window casement bolts; metal floors; metal window frames; frames of metal for building; casement windows of metal; floor tiles of metal; tiles of metal for building; knobs of metal; metal doors; fittings of metal for building, namely metal joinery fittings, metal window fittings, metal fittings for pipes; angle irons of metal; elbows of metal for pipes; stair treads of metal; pillars of metal for buildings; wire of common metal alloys, except fuse wire; wire; thread of metal for tying-up purposes being binding thread of metal; metal door bolts; metal bolts being metal locks; latches of metal; metal beams; metal shims; props of metal being construction elements made of metal being supports
- Class 019 — Non-metallic building materials: Mortar for building; alabaster glass for building; safety glass for building purposes; window glass for building, except glass for vehicle windows; gypsum for use as building material; moldings, not of metal, for building; veneer wood; building sheets, non-metallic, namely common sheet glass for building, sheets of plastic fabric used as an insulating barrier in building construction; door casings, not of metal; transportable buildings, not of metal; framework for building, not of metal; non-metal balustrades; non-metallic building materials, namely reinforcing materials not of metal for building; building glass; ceilings, not of metal; bituminous coatings for roofing; laths, not of metal; shutters, not of metal; floors, not of metal; casement windows, not of metal; wall tiles, not of metal
- Class 027 — Floor coverings: Wall hangings, non-textile; floor coverings, namely floor runners, carpet tiles for covering floors, carpets, rugs, mats and matting, linoleum for covering existing floors
Owner
Prosecution history
- 13 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 26 Oct 2024 — REFUSAL PROCESSED BY IB
- 07 Oct 2024 — EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
- 07 Oct 2024 — OPPOSITION INSTITUTED NO. 999999
- 02 Oct 2024 — OPPOSITION NOTICE (IB REFUSAL) SENT TO IB
- 02 Oct 2024 — OPPOSITION NOTICE (IB REFUSAL) CREATED
- 14 Sept 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 28 Aug 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 28 Aug 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 25 Jun 2024 — EXTENSION OF TIME TO OPPOSE RECEIVED
- 04 Jun 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 04 Jun 2024 — PUBLISHED FOR OPPOSITION
- 15 May 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 29 Apr 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 26 Apr 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED