KYOZIN RE-ROOF
Live / Registered — Registered (as of 16 Jul 2024)
What this means for you
Registered since 16 Jul 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79360592
- Registration number
- 7445187
- Mark type
- Word mark
- Filed
- 20 Oct 2022
- Published for opposition
- 30 Apr 2024
- Registered
- 16 Jul 2024
- Attorney of record
- Douglas R. Wolf
Goods and services
- Class 019 — Non-metallic building materials: Roofing building materials of plastic, rubber, plaster, lime, cement or synthetic materials, namely, non-metal tiles for roofs, non-metal roofs claddings for buildings, non-metal sheets and tiles for use in construction, namely, repair and reinforcement of roofs, non-metal sheets and tiles for the construction of roofs; plastic building materials, namely, boards; synthetic building materials, namely, synthetic roofing shingles for creating landscape settings, and non-metal sheets comprised of cement, synthetic fiber, and synthetic resin for use in construction, namely, repair and reinforcement of roofs, walls, and ceilings; asphalt, and asphalt building or construction materials in the nature of asphalt roof coatings, asphalt roofing felt, asphalt roofing papers; asphalt sheets for construction of buildings, roofs and other structures; plaster for building purposes; lime building or construction materials; building or construction materials of plaster; sheets comprised of cement and synthetic resin for use in repair, reinforcement and/or protection of cement or concrete constructions and structures; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement and/or protection of cement or concrete constructions and structures; building or construction materials comprised of cement and synthetic resin, namely, sheets for use in repair, reinforcement and protection of roofs, walls, floors, and ceilings; building or construction materials comprised of cement, synthetic resin and synthetic fiber, namely, sheets for use in repair, reinforcement and protection of roofs, walls, floors, and ceilings; sheets comprised of cement and synthetic resin for use in building or construction; sheets comprised of cement, synthetic resin and synthetic fiber for use in building or construction; sheets comprised of cement and synthetic resin for use in repair, reinforcement, protection and/or leak-prevention of buildings or structures; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement, protection and/or leak-prevention of buildings or structures; sheets comprised of cement and synthetic resin for use in repair, reinforcement, protection and/or leak-prevention of roofs; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement, protection and/or leak-prevention of roofs; roofing in sheet form comprised of cement and synthetic resin; roofing in sheet form comprised of cement, synthetic resin and synthetic fiber
- Class 037 — Building construction and repair services: roofing services; construction consultancy; advisory services or consultancy relating to roofing services; providing information relating to roofing services; repair of roofing; roofing maintenance services; agency services relating to roofing services
Owner
- KEIWA Incorporated, JP
- KEIWA INC., JP
- KEIWA INC., JP
- KEIWA INC., JP
Prosecution history
- 28 Feb 2025 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 10 Jan 2025 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 21 Dec 2024 — FINAL DISPOSITION NOTICE SENT TO IB
- 21 Dec 2024 — FINAL DISPOSITION PROCESSED
- 17 Oct 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 16 Jul 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 16 Jul 2024 — REGISTERED-PRINCIPAL REGISTER
- 16 Jul 2024 — REGISTERED-PRINCIPAL REGISTER
- 08 Jul 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 18 Jun 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 17 Jun 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 30 Apr 2024 — NOTIFICATION PROCESSED BY IB
- 30 Apr 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 30 Apr 2024 — PUBLISHED FOR OPPOSITION
- 10 Apr 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB