VIRIDI
Live / Applied — Non-final action mailed (as of 25 Nov 2025)
What this means for you
Not registered yet, but its 29 Aug 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79358183
- Mark type
- Stylized text
- Filed
- 29 Aug 2022
- Attorney of record
- William E OBrien, Esq.
Goods and services
- Class 036 — Insurance and financial services: Development of holistic energy concepts from a financial point of view, namely, IRR calculation, financial modeling for the investment into energy concepts using different sources of energy and for energy supplies service companies
- Class 037 — Building construction and repair services: Construction consultancy relating to installations for energy distribution; construction services relating to apparatus, installations and equipment for generating, conducting, switching, converting, storing, regulating, controlling and receiving electrical energy, in particular in mechanical, plant, heating and electrical engineering, namely, construction of energy plants ; construction, repair and maintenance of electrical generators, wind turbines, electricity generators, wind turbines, wind energy systems, energy supply systems, energy infrastructures, solar heating systems, solar powered systems, utility scale solar systems, solar electric systems and solar thermal systems; repair and maintenance of fuel cells; construction of energy infrastructure buildings; construction services related to hydrogen tank farms and systems, namely, outdoor fuel storage facilities, compressor systems, namely, outdoor fuel storage facilities, tank farms, fuel tanks, compressors, fuel lines, fuel pumps, sensors, piping systems, fuel control systems and outdoor tank farms, namely, construction of energy plants ; installation, maintenance and repair of filters and machines for the removal of carbon dioxide from the air
Owner
- Viridi RE GmbH, DD
Prosecution history
- 13 Mar 2026 — ATTORNEY REVIEW COMPLETED
- 12 Mar 2026 — DIVISIONAL PROCESSING COMPLETE
- 26 Jan 2026 — DIVISIONAL REQUEST RECEIVED
- 02 Mar 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 26 Jan 2026 — TEAS REQUEST TO DIVIDE RECEIVED
- 25 Nov 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 25 Nov 2025 — NON-FINAL ACTION E-MAILED
- 25 Nov 2025 — NON-FINAL ACTION WRITTEN
- 13 May 2025 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
- 12 Nov 2024 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 30 Jun 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 07 Jun 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 07 Jun 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 22 Mar 2024 — NEW REPRESENTATIVE AT IB RECEIVED
- 12 Feb 2024 — TEAS CHANGE OF CORRESPONDENCE RECEIVED