SEASNAVY
Dead / Abandoned — Abandoned — failure to respond (as of 28 Dec 2023)
What this means for you
This application is over — abandoned 11 Dec 2023. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79356600
- Mark type
- Word mark
- Filed
- 07 Jul 2022
- Abandoned
- 11 Dec 2023
Goods and services
- Class 009 — Scientific and electric apparatus: Devices, components and accessories for the automation in the naval field, namely, systems, components, accessories for the management, monitoring and control of on-board and navigation systems; hardware and software for the management of the aforesaid systems; receiving and transmitting apparatus for communication between the aforesaid systems; electric and electronic systems and apparatus, computer software and programs for the control, regulation and monitoring, including remotely of electrical and generation systems, of lighting, heating, aeration and air conditioning systems, of safety, signaling, alarm and emergency devices, of machinery equipment, of apparatus for the diffusion, transmission, reception and recording of sounds and signals; on-board communication systems; acoustic, optical and mechanical signaling, alarm, emergency and anti-burglar devices and components thereof; components and accessories for the installation and management of electrical and generation systems, electrical loads and electrical signals in the naval field; light dimmers [regulators], electric; fire detecting and fire-fighting systems and apparatus; closed circuit television apparatus
- Class 037 — Building construction and repair services: Installation, maintenance, repair, replacement and tuning of devices, components and accessories for the automation in the naval field, namely, systems, components, accessories for the management, monitoring and control of on-board and navigation systems; installation and regulating of audio and video distribution systems and apparatus; naval shipbuilding; advisory and consultancy regarding shipbuilding; building construction, repair and installation services, all related to seagoing vessels and their machines, motors and engines, components, parts, and accessories
Owner
Prosecution history
- 29 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 26 Sept 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 17 Jan 2025 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 30 Dec 2024 — FINAL DISPOSITION NOTICE SENT TO IB
- 29 Dec 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 21 May 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 01 May 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 01 May 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 28 Dec 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 28 Dec 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 28 Dec 2023 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 04 Jul 2023 — REFUSAL PROCESSED BY IB
- 10 Jun 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 10 Jun 2023 — REFUSAL PROCESSED BY MPU
- 26 Apr 2023 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW