E-EXTENDER
Dead / Abandoned — Abandoned — failure to respond (as of 25 Jan 2024)
What this means for you
This application is over — abandoned 08 Jan 2024. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79355611
- Mark type
- Stylized text
- Filed
- 21 Jun 2022
- Abandoned
- 08 Jan 2024
Goods and services
- Class 007 — Machines and machine tools: Heat exchangers being parts of machines and their parts and fittings; alternators; direct current generators; parts and fittings for automobile motors; cooling radiators for electric vehicle components, namely, motors
- Class 009 — Scientific and electric apparatus: Electronic control unit for motors for electric vehicles, and their parts and fittings; cooling devices for batteries of electric cars and hybrid cars, and their parts and fittings; electrical inverters for motors; heat regulating apparatus for electric vehicle components, namely, inverters, DC-DC converters, batteries, on-board battery chargers
- Class 011 — Environmental control apparatus: Heat pumps and their parts and fittings; heat exchangers, other than parts of machines, and their parts and fittings; refrigerating apparatus and their parts and fittings
- Class 012 — Vehicles: Motors for automobiles; electric vehicles and their parts and fittings; AC motors or DC motors for land vehicles, not including their parts; vessels (boats and ships) and their structural parts and fittings; aircraft and their structural parts and fittings; railway rolling stock and their structural parts and fittings
Owner
Prosecution history
- 15 Feb 2025 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 27 Jan 2025 — FINAL DISPOSITION NOTICE SENT TO IB
- 26 Jan 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 26 Jan 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 25 Jan 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 25 Jan 2024 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 26 Jul 2023 — REFUSAL PROCESSED BY IB
- 05 Jul 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 05 Jul 2023 — REFUSAL PROCESSED BY MPU
- 23 May 2023 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 22 May 2023 — NON-FINAL ACTION WRITTEN
- 26 Apr 2023 — CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
- 11 Apr 2023 — CORRECTION TRANSACTION RECEIVED FROM IB
- 31 Mar 2023 — ASSIGNED TO EXAMINER
- 02 Dec 2022 — APPLICATION FILING RECEIPT MAILED