VIROC BY INVESTWOOD
Dead / Abandoned — Abandoned — failure to respond (as of 19 Mar 2024)
What this means for you
This application is over — abandoned 06 Mar 2024. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79355278
- Mark type
- Design + words
- Filed
- 20 Sept 2022
- Abandoned
- 06 Mar 2024
Goods and services
- Class 019 — Non-metallic building materials: Monuments, not of metal; concrete panels; boards made of wood particles; non-metallic temporary fencing; acoustic panels, not of metal; wood panelling; fencing panels (non-metallic -); building panels, not of metal; boards made of wood particles; particleboard; wooden floor boards; wall linings, not of metal, for building; ceiling boards, not of metal; fibreboard for building; building panels, not of metal; fiberboard [building materials]; fibreboard for building; building panels, not of metal; partitions, not of metal; space dividers [structures], not of metal; partitions being non-metallic building materials; cementitious protective coatings; cements for building; ready-to-use cement for building purposes; cementitious waterproofing coatings; fireproof cement coatings; concrete coatings; cladding board (non-metallic -); cladding materials (non-metallic -); coatings [building materials]; roofing underlayment; coverings, not of metal, for building; flashing, not of metal, for building; suspended ceilings (non-metallic -); fibre boards of wood fibre bonded with resin and particle boards; wall panelling made of non-metallic materials; wall panelling made of non-metallic materials; wall linings, not of metal, for building; partitions, not of metal; prefabricated non-metal walls; wall linings, not of metal, for building; interior walls of non-metallic materials; walls (non-metallic -); moveable walls made of non-metallic materials; spacers being building elements made of fibre reinforced cement; wood-fiber reinforced cement boards [cement excelsior boards]; concrete floors; laminate flooring, not of metal; concrete walls for building; cladding (non-metallic -) for ceilings; non-metal decking; facades of non-metallic materials; building fronts (non-metallic -); cladding (non-metallic -) for facades; facade elements of non-metallic materials; facade construction components of non-metallic materials
- Class 037 — Building construction and repair services: Construction of public facilities; erecting of housing areas; construction of public works; building, construction and demolition; construction information; construction of parts of buildings; provision of construction information; building construction supervision; construction services; building sealing; civil engineering construction; residential and commercial building construction; general building contractor services; building construction supervision; construction of buildings and other structures; erection of formwork for building and construction; building construction consultancy; advisory services relating to the construction of buildings and other structures; consultancy, information and advisory services relating to the construction of public works; installation of coloured panels in building facias; erection of curtain walling; construction of curtain walls
Owner
Prosecution history
- 08 May 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 04 Apr 2025 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 20 Mar 2025 — FINAL DISPOSITION NOTICE SENT TO IB
- 20 Mar 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 07 May 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 17 Apr 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 17 Apr 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 19 Mar 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 19 Mar 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 19 Mar 2024 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 25 Sept 2023 — REFUSAL PROCESSED BY IB
- 05 Sept 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 05 Sept 2023 — REFUSAL PROCESSED BY MPU
- 16 Aug 2023 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 15 Aug 2023 — NON-FINAL ACTION WRITTEN