SCRIMBER

Dead / Abandoned — Abandoned — failure to respond (as of 29 Feb 2024)

What this means for you

This application is over — abandoned 20 Feb 2024. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79355038
Mark type
Stylized text
Filed
22 Sept 2022
Abandoned
20 Feb 2024

Goods and services

  • Class 019 — Non-metallic building materials: Non-metallic construction materials; non-metallic rigid pipes for building; asphalt, pitch, tar and bitumen; transportable buildings not of metal; monuments not of metal; logs (building materials); building lumber; planks of wood for building; wood posts; structural and architectural members formed of pressed wood fibers; moldable wood; partly processed timber; plywood; plywood panels; semi-worked wood; fire resistant wood; manufactured timber; halved timber; multi-layered wood; wood pulp board for building; assembly parts of wood; artificial timber; fiber boards (building materials); hardboard; raw and coated chipboard for the building industry, furniture and interior decorating; refractory construction materials, not of metal; prefabricated joinery products, excluding furniture; modular homes not of metal; prefabricated houses not of metal
  • Class 042 — Scientific and technological services: Scientific and technological services as well as research and design services relating thereto; industrial analysis, industrial research and industrial design services; quality control and authentication services; technical project planning; construction work planning; architectural services; design of interior decor; construction project development; construction drafting; engineering; engineering work; engineering services in the field of construction technology

Owner

Prosecution history

  • 22 Mar 2025 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 03 Mar 2025 — FINAL DISPOSITION NOTICE SENT TO IB
  • 02 Mar 2025 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 29 Apr 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 10 Apr 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 10 Apr 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 01 Mar 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 29 Feb 2024 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 29 Feb 2024 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 04 Sept 2023 — REFUSAL PROCESSED BY IB
  • 16 Aug 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 16 Aug 2023 — REFUSAL PROCESSED BY MPU
  • 15 Jul 2023 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 14 Jul 2023 — NON-FINAL ACTION WRITTEN
  • 06 Jul 2023 — ASSIGNED TO EXAMINER

View this trademark record on Marksy