ZEUS
Live / Registered — Registered (as of 06 Feb 2024)
What this means for you
Registered since 06 Feb 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79353466
- Registration number
- 7296125
- Mark type
- Stylized text
- Filed
- 03 Jun 2022
- Published for opposition
- 21 Nov 2023
- Registered
- 06 Feb 2024
- Attorney of record
- Charlene Minx
Goods and services
- Class 007 — Machines and machine tools: Carbon capture apparatus and installations, namely, machines for blast cleaning a surface; hydraulic pumps, compressors for machines and gas dispensers, namely, gas compressors; gas filling installations, namely, gas pumps for service stations; installations for utilization of the process for capturing emissions, namely, emission reduction units for motors and engines, namely, catalytic converters; steam engine boilers for power generation, other than for land vehicles; heat exchangers being parts of machines; power installations and backup power supply systems, namely, electric power generators for emergency use; structural parts for all the aforesaid goods
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for distributing, transforming, accumulating, regulating the process of capturing emissions, namely, electrical controllers; apparatus and instruments for use in the generation, transmission, distribution, supply and storage of carbon, namely, gas meters; emission measuring and dispensing equipment, namely, gas flow meters; downloadable software for operating carbon capture instruments, controls, apparatus, equipment, and machines for use in the fields of energy, chemicals, oil and gas; inverters; transformers; electrical connections; electric cables and electric wires; all above for use in the handling, processing, sorting and storage of goods and materials for subsea installations
- Class 037 — Building construction and repair services: Power infrastructure construction, namely, building constructions for civil infrastructure projects; construction of power plants; construction and maintenance of carbon capture facilities
- Class 039 — Transportation and storage services: Consultancy and advisory services relating to the transport and storage of CO2; consultancy and advisory services relating to transfer, distribution, supply and storage of CO2, namely, consultation in the field of transportation, delivery and storage of goods
- Class 040 — Treatment of materials: Generation of power; production of energy by power plants; production of electrical power from renewable sources; processing of materials from discharges, namely, processing of fuel materials; consultancy and advisory services relating to the aforesaid services; consultancy and advisory services relating to the processing and handling of CO2, namely, consultation in the field of gas processing services; consultancy and advisory services relating to the generation, processing of CO2, namely, consultation in the field of gas processing and production services
- Class 042 — Scientific and technological services: Consultancy relating to technological services in the field of power and energy supply, namely, computer technology consultancy; scientific and technological services and research including in the field of carbon capture and storage, namely, scientific research and development; information and consultancy relating to research in carbon capture and storage and related technologies; design services for power plants and production facilities; industrial analysis and research in the field of renewable energy sources; design and development of machinery and machine tools in the energy industry
Owner
- Aker Solutions AS, NO
- Aker Solutions AS, NO
- Aker Solutions AS, NO
Prosecution history
- 08 Mar 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 02 Jun 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 11 May 2024 — FINAL DISPOSITION NOTICE SENT TO IB
- 11 May 2024 — FINAL DISPOSITION PROCESSED
- 06 May 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 06 Feb 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 06 Feb 2024 — REGISTERED-PRINCIPAL REGISTER
- 21 Nov 2023 — NOTIFICATION PROCESSED BY IB
- 21 Nov 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 21 Nov 2023 — PUBLISHED FOR OPPOSITION
- 01 Nov 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 01 Nov 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 01 Nov 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 13 Oct 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 26 Sept 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED