XSPGR
Live / Registered — Registered (as of 07 Nov 2023)
What this means for you
Registered since 07 Nov 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79350795
- Registration number
- 7209628
- Mark type
- Design + words
- Filed
- 18 Jun 2022
- Published for opposition
- 22 Aug 2023
- Registered
- 07 Nov 2023
- Attorney of record
- Angela S. Kalsi
Goods and services
- Class 007 — Machines and machine tools: Cleaning apparatus, namely, pressure wave generators for cleaning industrial installations, machines and power plants; Machines for cleaning boilers, boiler installations, incinerators, incinerators and containers, namely, pressure wave generators for cleaning boilers, and structural parts and fittings therefor
- Class 009 — Scientific and electric apparatus: Electrical measuring, testing, checking, monitoring and controlling apparatus and instruments, namely, electronic remote control for the operation of pressure wave generators for cleaning boilers; Computer hardware and downloadable software, particularly for controlling and checking cleaning apparatus and devices
- Class 037 — Building construction and repair services: Installation, maintenance and repair of pressure wave generators for cleaning boilers; Installation, maintenance and repair of cleaning apparatus used for the cleaning of industrial installations, machines, power plants, boilers, boiler installations, incinerators and containers; provision of information relating to the repair or maintenance of cleaning equipment for all the above-mentioned services
Owner
Prosecution history
- 04 Mar 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 09 Feb 2024 — FINAL DISPOSITION NOTICE SENT TO IB
- 09 Feb 2024 — FINAL DISPOSITION PROCESSED
- 07 Feb 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 07 Nov 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 07 Nov 2023 — REGISTERED-PRINCIPAL REGISTER
- 22 Aug 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 22 Aug 2023 — PUBLISHED FOR OPPOSITION
- 21 Aug 2023 — NOTIFICATION PROCESSED BY IB
- 02 Aug 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 02 Aug 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 02 Aug 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 18 Jul 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 18 Jul 2023 — EXAMINER'S AMENDMENT ENTERED
- 18 Jul 2023 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED