POTATOGUARD
Live / Registered — Registered (as of 22 Aug 2023)
What this means for you
Registered since 22 Aug 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79349748
- Registration number
- 7141409
- Mark type
- Design + words
- Filed
- 09 May 2022
- Published for opposition
- 06 Jun 2023
- Registered
- 22 Aug 2023
- Attorney of record
- Robert S. Broder
Goods and services
- Class 001 — Chemicals: Compost, manures, fertilizers; biological preparations for use in industry and science; biofertilizers for use in seed treatment; soil conditioning preparations; soil improving preparations; preparations for improving the soil; soil additives; chemical preparations for use in agriculture, namely, chemical preparations for the treatment of seeds; fertilizers for soil; fertilizers; Biotechnologically-formed genes for use in the manufacture of agricultural seeds; seed treatment chemicals for the preservation of agricultural seeds and for the preservation of crop seeds; growing media for plants; plant growth regulators for agricultural use; natural fertilizers; organic fertilizers; dressings for seeds, namely, seed treatment chemicals for agricultural use; seed preserving substances, namely, seed treatment chemicals for agricultural use; seed coatings in the nature of fertilizer; substances for promoting plant growth, namely, fertilizing preparations
- Class 005 — Pharmaceuticals: Preparations for destroying noxious animals; fungicides; insecticides; biocides; herbicides
- Class 031 — Natural agricultural products: Raw and unprocessed seeds, namely, agricultural seeds and crop seeds; raw and unprocessed grains; fresh fruits, nuts, vegetables and herbs; natural plants and flowers; unprocessed onions; seedlings; crop seeds; agricultural seeds in pellet form; agricultural seeds coated with an anti-parasitic preparation for planting; agricultural seeds coated with a fertilizer for planting; seeds for planting; flower bulbs
Owner
Prosecution history
- 19 Dec 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 27 Nov 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 27 Nov 2023 — FINAL DISPOSITION PROCESSED
- 22 Nov 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 22 Aug 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 22 Aug 2023 — REGISTERED-PRINCIPAL REGISTER
- 06 Jun 2023 — NOTIFICATION PROCESSED BY IB
- 06 Jun 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 06 Jun 2023 — PUBLISHED FOR OPPOSITION
- 17 May 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 17 May 2023 — REFUSAL PROCESSED BY IB
- 17 May 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 17 May 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 04 May 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 May 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED