ÇIMSA SHAPE TODAY FOR TOMORROW
Live / Registered — Registered (as of 26 Dec 2023)
What this means for you
Registered since 26 Dec 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79346059
- Registration number
- 7251211
- Mark type
- Design + words
- Filed
- 11 Jan 2022
- Published for opposition
- 10 Oct 2023
- Registered
- 26 Dec 2023
- Attorney of record
- Andrew T. Rissler
Goods and services
- Class 019 — Non-metallic building materials: Sand, gravel crushed stone, cement, gypsum for use in construction and road construction; building materials as finished products made of concrete, gypsum, clay, natural or artificial stone, construction and road construction purposes, included in this class, namely, concrete, plaster, lime building materials, heat-resistant cement, white cement, plaster, cast for building purposes in the nature of non-metal castings, ready-mixed concrete, building stone in the nature of surface coatings containing natural and artificial stones for use in constructing interior walls, facades, and floors, roofing cement, transportable precast concrete buildings and structural elements therefor, concrete poles for use in building and construction, concrete fence pickets, concrete poles for use as building materials, namely, for power lines, non-metallic building materials, namely, concrete, plaster, lime building materials, heat-resistant cement, white cement, plaster, cast for building purposes in the nature of non-metal castings, ready-mixed concrete, building stone in the nature of surface coatings containing natural and artificial stones for use in constructing interior walls, facades, and floors, roofing cement, transportable precast concrete buildings and structural elements therefor, concrete poles for use as building materials, namely, for use in building and construction, concrete crash barriers not of metal for building purposes; natural and synthetic surface coatings in the form of panels and sheets, being building materials, namely, concrete panels
Owner
Prosecution history
- 07 Nov 2024 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 29 Apr 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 28 Mar 2024 — GENERIC MADRID TRANSACTION SENT TO IB
- 28 Mar 2024 — GENERIC MADRID TRANSACTION CREATED
- 26 Mar 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 26 Dec 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 26 Dec 2023 — REGISTERED-PRINCIPAL REGISTER
- 10 Oct 2023 — NOTIFICATION PROCESSED BY IB
- 10 Oct 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 10 Oct 2023 — PUBLISHED FOR OPPOSITION
- 21 Sept 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 20 Sept 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 20 Sept 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 08 Aug 2023 — WITHDRAWN FROM PUB - OG REVIEW QUERY
- 27 Jul 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER