XABER

Live / Registered — Registered (as of 30 Jan 2024)

What this means for you

Registered since 30 Jan 2024. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79346016
Registration number
7292302
Mark type
Stylized text
Filed
05 May 2022
Published for opposition
14 Nov 2023
Registered
30 Jan 2024
Attorney of record
Pamela N. Hirschman

Goods and services

  • Class 006 — Metal goods: Metal mounting brackets for general use; Mounting brackets of metal for securing timber trusses; Supporting mounting brackets of metal for general use; Products of metal for use in structural engineering, namely nail plates and mounting brackets for general use; Cantilevered mounting brackets of metal for general use; Mounting brackets of metal for building; Building products of metal, namely, nail plates and mounting brackets for securing timber trusses; Architectural metalwork for use in building; Building frameworks of metal; Framework of metal for building; Frames of metal for building; Metal building beams; Metal beams for building purposes; Metal building materials in the form of beams; Metal fastening devices for building purposes, namely, nail plates and mounting brackets for fastening timber truss members together; Securing devices, namely, fastenings of metal for building purposes, namely, nail plates and mounting brackets for fastening timber truss members together
  • Class 009 — Scientific and electric apparatus: Downloadable software for the design and construction of wooden trusses; Downloadable software for use by manufacturers of trusses in the design, construction and architectural layout of trusses and associated structural components and systems; Downloadable software for use by manufacturers of trusses in truss fabricating plant management including the design, manufacture, assembly, inventory, distribution and use of building components; Downloadable software for use in the construction and building industry, namely, downloadable software for use in building construction database management and as a spreadsheet for building construction project management, building construction funding, and building construction land use planning

Owner

Prosecution history

  • 21 May 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 01 May 2024 — FINAL DISPOSITION NOTICE SENT TO IB
  • 01 May 2024 — FINAL DISPOSITION PROCESSED
  • 30 Apr 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 30 Jan 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 30 Jan 2024 — REGISTERED-PRINCIPAL REGISTER
  • 21 Jan 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 18 Jan 2024 — ASSIGNED TO EXAMINER
  • 03 Jan 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 03 Jan 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 14 Nov 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 14 Nov 2023 — PUBLISHED FOR OPPOSITION
  • 13 Nov 2023 — NOTIFICATION PROCESSED BY IB
  • 25 Oct 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 25 Oct 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

View this trademark record on Marksy