BARLINEK NEXT STEP WATERPROOF HYBRID FLOORS

Dead / Abandoned — Abandoned — failure to respond (as of 07 Aug 2023)

What this means for you

This application is over — abandoned 21 Jul 2023. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79345892
Mark type
Design + words
Filed
28 Jan 2022
Abandoned
21 Jul 2023

Goods and services

  • Class 019 — Non-metallic building materials: Wood joints; construction plastic systems for mounting planks and wooden components; construction fixings, connectors, joints and holders for mounting and connecting boards and elements of wood; construction fasteners for boards and elements of wood; expansion joints of non-metallic materials for use in construction; milled joints in wooden panels and boards with a plastic element for laying floorboards in a traditional herringbone pattern without using the right and left woodblocks; floors, not of metal; wooden flooring; planks; parquet floor boards; duckboards, not of metal; floor boards, adhesive and non-adhesive; floor panels; parquet flooring, mosaics; floor tiles, not of metal; parquet floor boards; skirting; hybrid flooring with an external wooden layer and core including stone powder and pcv resin; pcv floors; hybrid flooring with an external wooden layer and core including stone powder and resin; rigid core floorings, resistant to water and high temperature fluctuations, made of minerals combined with a polymer; laminated parquet flooring; floating floors; rubber flooring; artificial wood flooring; plinths; sawn timber for floors; terrace boards; wooden components for decking and balconies; timber (sawn-), dressed timber, manufactured timber, veneer wood, building timber, building timber, worked timber; staircases, not of metal; wooden staircases; banisters; balustrading; handrails; wood veneers; veneer wood; wooden wainscoting

Owner

Prosecution history

  • 24 Aug 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 08 Aug 2024 — FINAL DISPOSITION NOTICE SENT TO IB
  • 08 Aug 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 29 Jan 2024 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 05 Jan 2024 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 03 Jan 2024 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 07 Aug 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 07 Aug 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 07 Aug 2023 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 21 Feb 2023 — ASSIGNED TO EXAMINER
  • 14 Feb 2023 — REFUSAL PROCESSED BY IB
  • 20 Jan 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 20 Jan 2023 — REFUSAL PROCESSED BY MPU
  • 15 Nov 2022 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 14 Nov 2022 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy