IENERGYSTOR

Dead / Abandoned — Abandoned — failure to respond (as of 22 Aug 2023)

What this means for you

This application is over — abandoned 07 Aug 2023. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79339331
Mark type
Word mark
Filed
18 Feb 2022
Abandoned
07 Aug 2023

Goods and services

  • Class 009 — Scientific and electric apparatus: Computer programs [downloadable software]; computer programs, recorded; modems; network communication equipment; smartphones; galvanometers; dynamometers; frequency meters; voltmeters; electricity meters; transformers; power distribution boxes; sensors; connectors [electricity]; electric power converters; microcontrollers; electrical adapters; voltage regulator; power controllers; inverters [electricity]; photovoltaic inverters; step-up transformers; thermostats; climate control digital thermostats; electric installations for the remote control of industrial operations; automation system for power plants; electric control devices for energy management; accumulators, electric; accumulator boxes; battery boxes; high tension batteries; chargers for electric accumulators; battery chargers; photovoltaic power generation equipment; batteries, electric; lithium-ion batteries; photovoltaic cells

Owner

Prosecution history

  • 14 Sept 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 23 Aug 2024 — FINAL DISPOSITION NOTICE SENT TO IB
  • 23 Aug 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 24 Oct 2023 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 04 Oct 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 04 Oct 2023 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 22 Aug 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 22 Aug 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 22 Aug 2023 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 28 Feb 2023 — REFUSAL PROCESSED BY IB
  • 04 Feb 2023 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 04 Feb 2023 — REFUSAL PROCESSED BY MPU
  • 13 Dec 2022 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 12 Dec 2022 — NON-FINAL ACTION WRITTEN
  • 05 Dec 2022 — ASSIGNED TO EXAMINER

View this trademark record on Marksy