ENTALPIA ENERGY
Live / Registered — Registered (as of 14 Nov 2023)
What this means for you
Registered since 14 Nov 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79338938
- Registration number
- 7215277
- Mark type
- Stylized text
- Filed
- 12 Jan 2022
- Published for opposition
- 29 Aug 2023
- Registered
- 14 Nov 2023
- Attorney of record
- James A. Stepan
Goods and services
- Class 009 — Scientific and electric apparatus: Photovoltaic inverters; photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; photovoltaic apparatus and installations, namely, solar modules for generating solar electricity; inverters; inverters for power supply; photovoltaic modules; photoelectric cells; photovoltaic cells; photovoltaic solar modules for production of electricity; ultracapacitors for energy storage; electric control devices for energy management; electric storage batteries; nickel-cadmium storage batteries; batteries; lithium phosphate batteries; lithium ion batteries; solar batteries; rechargeable batteries; electric batteries; galvanic batteries; accumulators; anode batteries; grids for batteries; rechargeable electric batteries; high tension batteries; chargers for electric batteries; electrical cells and batteries; charging stations for electric vehicles; battery charging devices for motor vehicles; solar-powered battery chargers; electronic circuits; logic circuits; integrated circuits; electronic control systems for machines; electronic cables; power cables; battery cables; electric cables; electric cables and wires; junction sleeves for electric cables; overvoltage protection relays; electronic devices for measuring electric current; electronic sensors for measuring solar radiation; solar panels for production of electricity
Owner
Prosecution history
- 18 Mar 2024 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 15 Feb 2024 — GENERIC MADRID TRANSACTION SENT TO IB
- 15 Feb 2024 — GENERIC MADRID TRANSACTION CREATED
- 14 Feb 2024 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 05 Jan 2024 — NEW REPRESENTATIVE AT IB RECEIVED
- 14 Nov 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 14 Nov 2023 — REGISTERED-PRINCIPAL REGISTER
- 16 Oct 2023 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 28 Sept 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 27 Sept 2023 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 04 Sept 2023 — NOTIFICATION PROCESSED BY IB
- 29 Aug 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Aug 2023 — PUBLISHED FOR OPPOSITION
- 11 Aug 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 09 Aug 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB