CONTRAIL MACHINERY
Live / Registered — Registered (as of 23 May 2023)
What this means for you
Registered since 23 May 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79334456
- Registration number
- 7057828
- Mark type
- Word mark
- Filed
- 11 Dec 2021
- Published for opposition
- 07 Mar 2023
- Registered
- 23 May 2023
- Attorney of record
- Bruce Margulies
Goods and services
- Class 007 — Machines and machine tools: Welding machines, electric; electric flash-butt welding machines for railways ; electrodes for welding machines; machines parts, namely blades; knives being parts of machines; industrial machines presses, namely rail bend testing press; railroad constructing machines, namely rail laying machines, ballast tamping machines, rail grinding machines, rail milling machines; bending machines
- Class 012 — Vehicles: rail vehicles, namely rail-road trucks, rail-road excavators, locomotives, wagons, trolleys; bogies for railway cars; rolling stock for railways
- Class 037 — Building construction and repair services: Installation, repair and maintenance of welding machines and welding equipments; installation, repair and maintenance for rail road construction machines and equipment; tehnical assistance and consultancy for welding machines and equipment; tehnical assistance and consultancy for rail road construction machines and equipment; refurbishment and repair of machines that have been worn or partially destroyed; rental of construction equipment and machines for railway
- Class 040 — Treatment of materials: Welding services for railway track; rental of electric welding machines
Owner
- DAN - GABY BOSTAN, RO
- DAVID BOSTAN, RO
- DAVID BOSTAN, RO
- DAVID BOSTAN, RO
Prosecution history
- 26 Feb 2026 — CHANGE OF OWNER RECEIVED FROM IB
- 17 Sept 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 28 Aug 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 28 Aug 2023 — FINAL DISPOSITION PROCESSED
- 23 Aug 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 23 May 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 23 May 2023 — REGISTERED-PRINCIPAL REGISTER
- 07 Mar 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 07 Mar 2023 — PUBLISHED FOR OPPOSITION
- 06 Mar 2023 — NOTIFICATION PROCESSED BY IB
- 15 Feb 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 15 Feb 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 15 Feb 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 01 Feb 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 20 Jan 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED